Calisto Velocity

Run every project, and bill the work it takes.

Plan a project in phases, record its time and receipts where the work happens, and decide what goes on the client’s invoice.

For client work and internal work.

velocity.calistoco.com/velocity/projects/atl-24

Website Rebuild · Atlântico Hotels Pågående

ATL-24 · Atlântico Hotels Group

Starta tidtagareLoggtidFakturering
ÖversiktTidslinjeMilestonesUppgifterKey Dates & ConditionsFesterDokumentUppdateringarÄndra orderBudgetTime & CostsFaktureringSite Controls
Where It Stands
Status
Pågående
Klient & Leverantör Inkorg
Atlântico Hotels Group
Startad
12/09/2026
Deadline
23/12/2026
What Is Waiting
Till faktura
14 464 €
Documents to Review
2
Open Requests for Information
1
Awaiting Counter-Signature
1
Booking Flow Built21/11/2026SlutfördPayments Due On It: 24 000 €
Content Migrated05/12/2026PågåendePayments Due On It: 18 000 €
Launch and Handover23/12/2026Väntar på kundenPayments Due On It: 30 000 €
Kostnadsförslag96 000 €
Fakturerad48 000 €
Till faktura14 464 €
Marginal % (tomt = din marginal för valutan)42.4%
Direct Costs3860 €
Lönekostnad31 420 €
Vinst26 970 €
Marginal %40 720 €
Hastighet
Din Timer
Tid loggad.02:14:48Booking flow: room pickerStarta tidtagare
Behöver dig
Väntar på dig4
Timer kvarstående1
Mina steg2
Din vecka
Inte inlämnadLoggad 31:45 · billable 27:30
Marlow & Finch · LisbonWebsite Rebuild · Atlântico HotelsPågående◆◆◆Marginal % (tomt = din marginal för valutan)42.4%Till faktura14 250,00 €
Estudio Calderón · BogotáCasa Patio · ChapineroPågående◆◆◆Marginal % (tomt = din marginal för valutan)36.1%Till faktura$ 48.600.000
Fitzgerald Heating & Electrical · CorkHeating Upgrade · Riverside Business CentrePågående◆◆◆Marginal % (tomt = din marginal för valutan)28.7%Till faktura€3,562.50
Lakeshore Consulting Engineers · TorontoBridge Rehabilitation · Don Valley ParkwayPågående◆◆◆Marginal % (tomt = din marginal för valutan)33.8%Till faktura$17,370.00
Barros Lima Advogados · São PauloCompra · Apartamento 142, Vila MarianaVäntar på kunden◆◆◆Marginal % (tomt = din marginal för valutan)51.2%Till fakturaR$ 18.400,00
Kōwhai Digital · AucklandBooking App · Waiheke FerriesFörsenad◆◆◆Marginal % (tomt = din marginal för valutan)31.5%Till faktura$32,000.00
Caribe Producciones · Santo DomingoCongreso Médico del CaribePågående◆◆◆Marginal % (tomt = din marginal för valutan)22.9%Till fakturaRD$865,000.00
Tanaka Design Office · OsakaKyoto Machiya HotelPågående◆◆◆Marginal % (tomt = din marginal för valutan)38.4%Till faktura¥4,280,000
Marlow & Finch · LisbonWebsite Rebuild · Atlântico HotelsPågående◆◆◆Marginal % (tomt = din marginal för valutan)42.4%Till faktura14 250,00 €
Estudio Calderón · BogotáCasa Patio · ChapineroPågående◆◆◆Marginal % (tomt = din marginal för valutan)36.1%Till faktura$ 48.600.000
Fitzgerald Heating & Electrical · CorkHeating Upgrade · Riverside Business CentrePågående◆◆◆Marginal % (tomt = din marginal för valutan)28.7%Till faktura€3,562.50
Lakeshore Consulting Engineers · TorontoBridge Rehabilitation · Don Valley ParkwayPågående◆◆◆Marginal % (tomt = din marginal för valutan)33.8%Till faktura$17,370.00
Barros Lima Advogados · São PauloCompra · Apartamento 142, Vila MarianaVäntar på kunden◆◆◆Marginal % (tomt = din marginal för valutan)51.2%Till fakturaR$ 18.400,00
Kōwhai Digital · AucklandBooking App · Waiheke FerriesFörsenad◆◆◆Marginal % (tomt = din marginal för valutan)31.5%Till faktura$32,000.00
Caribe Producciones · Santo DomingoCongreso Médico del CaribePågående◆◆◆Marginal % (tomt = din marginal för valutan)22.9%Till fakturaRD$865,000.00
Tanaka Design Office · OsakaKyoto Machiya HotelPågående◆◆◆Marginal % (tomt = din marginal för valutan)38.4%Till faktura¥4,280,000
Marlow & Finch · LisbonWebsite Rebuild · Atlântico HotelsPågående◆◆◆Marginal % (tomt = din marginal för valutan)42.4%Till faktura14 250,00 €
Estudio Calderón · BogotáCasa Patio · ChapineroPågående◆◆◆Marginal % (tomt = din marginal för valutan)36.1%Till faktura$ 48.600.000
Fitzgerald Heating & Electrical · CorkHeating Upgrade · Riverside Business CentrePågående◆◆◆Marginal % (tomt = din marginal för valutan)28.7%Till faktura€3,562.50
Lakeshore Consulting Engineers · TorontoBridge Rehabilitation · Don Valley ParkwayPågående◆◆◆Marginal % (tomt = din marginal för valutan)33.8%Till faktura$17,370.00
Barros Lima Advogados · São PauloCompra · Apartamento 142, Vila MarianaVäntar på kunden◆◆◆Marginal % (tomt = din marginal för valutan)51.2%Till fakturaR$ 18.400,00
Kōwhai Digital · AucklandBooking App · Waiheke FerriesFörsenad◆◆◆Marginal % (tomt = din marginal för valutan)31.5%Till faktura$32,000.00
Caribe Producciones · Santo DomingoCongreso Médico del CaribePågående◆◆◆Marginal % (tomt = din marginal för valutan)22.9%Till fakturaRD$865,000.00
Tanaka Design Office · OsakaKyoto Machiya HotelPågående◆◆◆Marginal % (tomt = din marginal för valutan)38.4%Till faktura¥4,280,000
Marlow & Finch · LisbonWebsite Rebuild · Atlântico HotelsPågående◆◆◆Marginal % (tomt = din marginal för valutan)42.4%Till faktura14 250,00 €
Estudio Calderón · BogotáCasa Patio · ChapineroPågående◆◆◆Marginal % (tomt = din marginal för valutan)36.1%Till faktura$ 48.600.000
Fitzgerald Heating & Electrical · CorkHeating Upgrade · Riverside Business CentrePågående◆◆◆Marginal % (tomt = din marginal för valutan)28.7%Till faktura€3,562.50
Lakeshore Consulting Engineers · TorontoBridge Rehabilitation · Don Valley ParkwayPågående◆◆◆Marginal % (tomt = din marginal för valutan)33.8%Till faktura$17,370.00
Barros Lima Advogados · São PauloCompra · Apartamento 142, Vila MarianaVäntar på kunden◆◆◆Marginal % (tomt = din marginal för valutan)51.2%Till fakturaR$ 18.400,00
Kōwhai Digital · AucklandBooking App · Waiheke FerriesFörsenad◆◆◆Marginal % (tomt = din marginal för valutan)31.5%Till faktura$32,000.00
Caribe Producciones · Santo DomingoCongreso Médico del CaribePågående◆◆◆Marginal % (tomt = din marginal för valutan)22.9%Till fakturaRD$865,000.00
Tanaka Design Office · OsakaKyoto Machiya HotelPågående◆◆◆Marginal % (tomt = din marginal för valutan)38.4%Till faktura¥4,280,000
Lakeshore Consulting Engineers · TorontoMin veckaPriya RamanAvslutatBetalda timmar38:30Till faktura$6,650.00
Kōwhai Digital · AucklandMilestonesDesign ApprovedSlutfördPayments Due On It$24,000.00
Marlow & Finch · LisbonArtiklar som väntarBooking flow: room pickerAvskrivetInspelat1140,00 €Till Bill855,00 €
Al Noor Interiors · DubaiÄndra orderTwo extra meeting podsUtfördPrisändring+AED 42,600.00
Barros Lima Advogados · São PauloKrävda dokumentComprovante de RendaGodkändRequested FromFernanda Albuquerque
Okafor & Partners · LagosRetaineravtalLekki Marine Services LtdNästan användVänster2 hÖvrigt belopp₦90,000
Mensah & Co. Chartered Accountants · AccraKostnaderOsu Office SuppliesGodkändGår tillFaktureras till kundenBeloppGH₵842.00
Harcourt Lane Solicitors · ManchesterDepositeringarPurchase · 88 Wilmslow RoadAnsöktMottagen£31,000.00
Lakeshore Consulting Engineers · TorontoMin veckaPriya RamanAvslutatBetalda timmar38:30Till faktura$6,650.00
Kōwhai Digital · AucklandMilestonesDesign ApprovedSlutfördPayments Due On It$24,000.00
Marlow & Finch · LisbonArtiklar som väntarBooking flow: room pickerAvskrivetInspelat1140,00 €Till Bill855,00 €
Al Noor Interiors · DubaiÄndra orderTwo extra meeting podsUtfördPrisändring+AED 42,600.00
Barros Lima Advogados · São PauloKrävda dokumentComprovante de RendaGodkändRequested FromFernanda Albuquerque
Okafor & Partners · LagosRetaineravtalLekki Marine Services LtdNästan användVänster2 hÖvrigt belopp₦90,000
Mensah & Co. Chartered Accountants · AccraKostnaderOsu Office SuppliesGodkändGår tillFaktureras till kundenBeloppGH₵842.00
Harcourt Lane Solicitors · ManchesterDepositeringarPurchase · 88 Wilmslow RoadAnsöktMottagen£31,000.00
Lakeshore Consulting Engineers · TorontoMin veckaPriya RamanAvslutatBetalda timmar38:30Till faktura$6,650.00
Kōwhai Digital · AucklandMilestonesDesign ApprovedSlutfördPayments Due On It$24,000.00
Marlow & Finch · LisbonArtiklar som väntarBooking flow: room pickerAvskrivetInspelat1140,00 €Till Bill855,00 €
Al Noor Interiors · DubaiÄndra orderTwo extra meeting podsUtfördPrisändring+AED 42,600.00
Barros Lima Advogados · São PauloKrävda dokumentComprovante de RendaGodkändRequested FromFernanda Albuquerque
Okafor & Partners · LagosRetaineravtalLekki Marine Services LtdNästan användVänster2 hÖvrigt belopp₦90,000
Mensah & Co. Chartered Accountants · AccraKostnaderOsu Office SuppliesGodkändGår tillFaktureras till kundenBeloppGH₵842.00
Harcourt Lane Solicitors · ManchesterDepositeringarPurchase · 88 Wilmslow RoadAnsöktMottagen£31,000.00
Lakeshore Consulting Engineers · TorontoMin veckaPriya RamanAvslutatBetalda timmar38:30Till faktura$6,650.00
Kōwhai Digital · AucklandMilestonesDesign ApprovedSlutfördPayments Due On It$24,000.00
Marlow & Finch · LisbonArtiklar som väntarBooking flow: room pickerAvskrivetInspelat1140,00 €Till Bill855,00 €
Al Noor Interiors · DubaiÄndra orderTwo extra meeting podsUtfördPrisändring+AED 42,600.00
Barros Lima Advogados · São PauloKrävda dokumentComprovante de RendaGodkändRequested FromFernanda Albuquerque
Okafor & Partners · LagosRetaineravtalLekki Marine Services LtdNästan användVänster2 hÖvrigt belopp₦90,000
Mensah & Co. Chartered Accountants · AccraKostnaderOsu Office SuppliesGodkändGår tillFaktureras till kundenBeloppGH₵842.00
Harcourt Lane Solicitors · ManchesterDepositeringarPurchase · 88 Wilmslow RoadAnsöktMottagen£31,000.00
Marlow & Finch · LisbonWebsite Rebuild · Atlântico HotelsPågående◆◆◆Marginal % (tomt = din marginal för valutan)42.4%Till faktura14 250,00 €
Estudio Calderón · BogotáCasa Patio · ChapineroPågående◆◆◆Marginal % (tomt = din marginal för valutan)36.1%Till faktura$ 48.600.000
Fitzgerald Heating & Electrical · CorkHeating Upgrade · Riverside Business CentrePågående◆◆◆Marginal % (tomt = din marginal för valutan)28.7%Till faktura€3,562.50
Lakeshore Consulting Engineers · TorontoBridge Rehabilitation · Don Valley ParkwayPågående◆◆◆Marginal % (tomt = din marginal för valutan)33.8%Till faktura$17,370.00
Barros Lima Advogados · São PauloCompra · Apartamento 142, Vila MarianaVäntar på kunden◆◆◆Marginal % (tomt = din marginal för valutan)51.2%Till fakturaR$ 18.400,00
Kōwhai Digital · AucklandBooking App · Waiheke FerriesFörsenad◆◆◆Marginal % (tomt = din marginal för valutan)31.5%Till faktura$32,000.00
Caribe Producciones · Santo DomingoCongreso Médico del CaribePågående◆◆◆Marginal % (tomt = din marginal för valutan)22.9%Till fakturaRD$865,000.00
Tanaka Design Office · OsakaKyoto Machiya HotelPågående◆◆◆Marginal % (tomt = din marginal för valutan)38.4%Till faktura¥4,280,000
Lakeshore Consulting Engineers · TorontoMin veckaPriya RamanAvslutatBetalda timmar38:30Till faktura$6,650.00
Kōwhai Digital · AucklandMilestonesDesign ApprovedSlutfördPayments Due On It$24,000.00
Marlow & Finch · LisbonArtiklar som väntarBooking flow: room pickerAvskrivetInspelat1140,00 €Till Bill855,00 €
Al Noor Interiors · DubaiÄndra orderTwo extra meeting podsUtfördPrisändring+AED 42,600.00
Barros Lima Advogados · São PauloKrävda dokumentComprovante de RendaGodkändRequested FromFernanda Albuquerque
Okafor & Partners · LagosRetaineravtalLekki Marine Services LtdNästan användVänster2 hÖvrigt belopp₦90,000
Mensah & Co. Chartered Accountants · AccraKostnaderOsu Office SuppliesGodkändGår tillFaktureras till kundenBeloppGH₵842.00
Harcourt Lane Solicitors · ManchesterDepositeringarPurchase · 88 Wilmslow RoadAnsöktMottagen£31,000.00
Calisto Velocity

From the hour worked to the invoice it goes on

Client work and internal work, for every business you work for, in each record’s own currency.

Time and Spend

Record time and spend where the work happens

Time is logged on a work order, a project’s task or no task, by the timer or after the fact, in the business you work for. A receipt photo becomes an expense, filed on your week’s report and paid back, billed to a client or kept as a cost.

Timer

Start it from Home, a project or a shortcut; one runs at a time and carries on across your devices.

velocity.calistoco.com/velocity/time

Tid

Var timme loggad på dina projekt, och timmarna per person.

Exportera CSVLoggtidStarta tidtagare
Timer i gång01:12:40Checkout Redesign · Fjordline Ferries · Payment step prototypesStoppa
Idag5.8
Denna vecka29.5
Fakturerbar denna vecka (hrs)26.0
Obetalda (timmar)61.5
Körande tidsmätare2
InläggPer person
StartMedlemProjektVaraktighet (min)FakturerbarStatusFakturerad
08:52Ingrid SolbergPayment step prototypesCheckout Redesign · Fjordline Ferries72JaKörandeNej
09:10Magnus HaugenApp store release 4.2Member App · Trondheim Sports Club49JaKörandeNej
07:45Sigrid BakkeAccessibility reviewCheckout Redesign · Fjordline Ferries105JaStoppadNej
13:00Ingrid SolbergSprint planningMember App · Trondheim Sports Club60NejStoppadNej
10:15Erik LundeRoom search filtersBooking Site · Lofoten Lodges150JaStoppadJa
08:30Magnus HaugenPush notification settingsMember App · Trondheim Sports Club150JaStoppadJa

Min vecka

Clock and work time in one week, typed into a cell or taken from your calendar.

velocity.calistoco.com/velocity/my-week

Min vecka

Ingrid Solberg

02.11.2026 till 08.11.2026 · Inte inlämnad

Föregående veckaNästa veckaKopiera förra veckanSkicka vecka
ArbeteMon 2Tue 3Wed 4Thu 5Fri 6Totalt
Payment step prototypesCheckout Redesign · Fjordline Ferries3:304:002:003:001:3014:00
Accessibility reviewCheckout Redesign · Fjordline Ferries1:001:302:301:002:008:00
App store release 4.2Member App · Trondheim Sports Club2:001:001:302:302:309:30
Daily stand-upMember App · Trondheim Sports Club0:150:150:150:150:151:15
Allmän tid0:300:301:000:300:303:00
Klockad8:157:157:157:157:4537:45
Betalda timmar8:007:007:007:007:3036:30

Loggad 35:45 · fakturerbar 31:30 · klockad 37:45

Från Din kalender
Design critique with FjordlineThu 5 · 10:00–11:00Lägg till i veckaInte arbete

Tidsinspelningar

Every entry by person and project, billable or not, and the hours not yet invoiced, exported as CSV.

velocity.calistoco.com/velocity/time?lens=by-person

Tid

Var timme loggad på dina projekt, och timmarna per person.

Exportera CSVLoggtidStarta tidtagare
Idag42.5
Denna vecka238.0
Fakturerbar denna vecka (hrs)211.5
Obetalda (timmar)93.5
InläggPer person
PersonProjektTimmarLaddningsbarNon-ChargeableFaktureradInlägg
AKAnanya KapoorTower B Facade · Lodha ParksideTower B Facade · Lodha Parkside46.5415.52832
RMRohan MehtaClinic Fit-Out · Bandra WestClinic Fit-Out · Bandra West5247.54.53640
PNPriya NairTower B Facade · Lodha ParksideTower B Facade · Lodha Parkside383622424
VSVikram ShettyHotel Lobby · Juhu Tara RoadHotel Lobby · Juhu Tara Road4438.55.530.528
NJNeha JoshiClinic Fit-Out · Bandra WestClinic Fit-Out · Bandra West35.5314.51820
ADArjun DesaiHotel Lobby · Juhu Tara RoadHotel Lobby · Juhu Tara Road4137422.530

Milage

A claim by distance, in kilometers or miles, at each category’s rate.

velocity.calistoco.com/velocity/expenses?capture=mileage

Kostnader

Kostnadsrapporter, varje kostnad med dess kvitto eller mil, och vad folk är skyldiga.

Ny kostnadRegistrera mil
RapporterKostnaderÅterbetalningar
DatumKostnadPersonKategoriBelopp
11/11/2026Site visit, Riverside Business Centre38 kmSeán MurphyMileage, Own Car€17.54
10/11/2026Skip hire for the bathroom strip-outPlant and HireAoife KellyPlant and Hire€240.00
09/11/2026Survey, 281 High Road24 kmSeán MurphyMileage, Own Car€11.08
08/11/2026Two double radiators and valvesMaterialsCiarán WalshMaterials€185.00
06/11/2026Boiler parts collection, Little Island17 kmCiarán WalshMileage, Own Car€7.85
Registrera mil
Milage

€21.23 · 46 km

AvbrytSpara kostnad

Reseförfrågningar

A trip asked for before it is booked, its expenses set against it.

velocity.calistoco.com/velocity/requests

Reseförfrågningar

Beviljad före resan: varje begäran, dess offert och vad som faktiskt användes

Be om ett köp+ New Travel Request
Väntar på beslut2
Godkänd3
Över uppskattning1
BegäranPersonDatumDestinationKostnadsförslagUtgifternaStatus
Client workshop, Grupo AltamiraMonterreyVOValeria Ochoa24/11–26/11Monterrey$28,400$6,120Godkänd
Supply chain review, Planta BajíoLeónDRDiego Ramírez17/11–20/11León$36,900$18,250Godkänd
Board presentation, Fondo PacíficoGuadalajaraVOValeria Ochoa14/11–15/11Guadalajara$21,500$9,800Godkänd
Industry conference and trainingBogotáLHLucía Herrera03/11–05/11Bogotá$54,200$51,870Stängd
Site assessment, Hoteles RivieraCancúnACAndrés Castillo27/10–29/10Cancún$32,600$35,940Stängd
Due diligence visit, Agro NorteHermosilloDRDiego Ramírez19/10–21/10Hermosillo$26,100$24,380Stängd

Per diem

The days away at the day’s rate, claimed from an approved travel request.

velocity.calistoco.com/velocity/requests/tr-2214
Till Förfrågningar

Client workshops, Nordkap Logistics Godkänd

Resor · Elin Bergström · 2026-11-08 – 2026-11-12 · Tromsø · Norway

Per diem
5 × 640 kr = 3 200 krClaim Per Diem
Kostnader mot det
08/11 · Flight to Tromsø3 420 krGodkänd
08/11 · Hotel, four nights7 360 krGodkänd
09/11 · Taxi to the client285 krGodkänd
10/11 · Workshop room1 180 krInlämnad
12/11 · Flight home2 960 krInlämnad
Estimate and Spent
Kostnadsförslag
18 500 kr
Utgifterna
15 205 kr
Against the Estimate
+3 295 kr

Ask for a Purchase, With Ledger

A purchase asked as a draft purchase order, on the purchase order’s own approval.

velocity.calistoco.com/velocity/requests?new=purchase

Reseförfrågningar

Beviljad före resan: varje begäran, dess offert och vad som faktiskt användes

Be om ett köp+ New Travel Request
Väntar på beslut3
Godkänd6
Över uppskattning1
Be om ett köp
ResorPurchase
Artiklar
ArtikelAntalEnhetskostnad
LED panel, 1x1, bi-colour4RM 1,450.00
Light stand, air-cushioned4RM 220.00
Softbox, 90 cm octagonal2RM 380.00
V-mount battery, 150 Wh4RM 540.00
Grip clamps, set of six1RM 160.00
Totalt15RM 9,760.00
Spara som utkastSkicka för godkännande

Receipt Capture, With Ledger

A receipt photo is read for its vendor, amount and date, the same capture as in Ledger and Today.

velocity.calistoco.com/velocity/expenses?capture=receipt

Kostnader

Kostnadsrapporter, varje kostnad med dess kvitto eller mil, och vad folk är skyldiga.

Ny kostnadRegistrera mil
Osu Office SuppliesOxford Street, Osu, Accra11/11/2026 · 10:42
A4 copier paper, 5 reamsGH₵212.00Lever-arch files, 10GH₵145.00Toner cartridge, blackGH₵389.00Envelopes, DL, 500GH₵96.00
TOTALGH₵842.00VAT incl. · Card ****4417
Upload the receipt, or drop it hereLeverantör, belopp och datum läses upp för dig
Faktureras till kundenHållna som vår kostnad
Ange manuelltSpara kostnad

Kostnadsrapporter

A person’s week of expenses with their receipts, approved or sent back, each one paid back, billed to a client or kept as a cost.

velocity.calistoco.com/velocity/expenses/reports/er-0418
Till Kostnader

Kostnadsrapport Inlämnad

Camila Paredes · 01/11/2026 – 07/11/2026

Skicka tillbakaGodkänn
DatumKostnadBeloppKvittoFakturerbarÅterbetaltStatus
1/11Flight, Lima to Cusco1/11S/ 612.00VisaI LönerapportenGodkänd
1/11Hotel, three nights, Plaza de Armas1/11S/ 885.00VisaI LönerapportenGodkänd
2/11Venue deposit, Casona San Blas2/11S/ 450.00VisaPaid by the businessGodkänd
3/11Taxi to the venue with the screens3/11S/ 48.00VisaI LönerapportenInlämnad
4/11Dinner with the client team4/11S/ 236.00VisaPaid DirectlyInlämnad
6/11Printing, launch banners6/11S/ 174.00VisaI LönerapportenInlämnad
Comes To
S/ 2,405.00
Utgifter mot ansökningar
Resor · Product launch, CuscoEstimate S/ 2,400 · S/ 2,185.00
Jag kontrollerade momsbeloppet · Godkänn
velocity.calistoco.com/velocity/time

Tid

Var timme loggad på dina projekt, och timmarna per person.

Exportera CSVLoggtidStarta tidtagare
Timer i gång01:12:40Checkout Redesign · Fjordline Ferries · Payment step prototypesStoppa
Idag5.8
Denna vecka29.5
Fakturerbar denna vecka (hrs)26.0
Obetalda (timmar)61.5
Körande tidsmätare2
InläggPer person
StartMedlemProjektVaraktighet (min)FakturerbarStatusFakturerad
08:52Ingrid SolbergPayment step prototypesCheckout Redesign · Fjordline Ferries72JaKörandeNej
09:10Magnus HaugenApp store release 4.2Member App · Trondheim Sports Club49JaKörandeNej
07:45Sigrid BakkeAccessibility reviewCheckout Redesign · Fjordline Ferries105JaStoppadNej
13:00Ingrid SolbergSprint planningMember App · Trondheim Sports Club60NejStoppadNej
10:15Erik LundeRoom search filtersBooking Site · Lofoten Lodges150JaStoppadJa
08:30Magnus HaugenPush notification settingsMember App · Trondheim Sports Club150JaStoppadJa
Granska

Decide each week, expense and request in one place

The review desk holds what waits on you: the person-weeks to sign off, expense reports, travel requests, write-downs and contractor statements, each with its context beside it. A week signed off is locked. The items are the same ones in the Approvals panel of your menu.

velocity.calistoco.com/velocity/review

Granska

Det som väntar på dig, med dess sammanhang bredvid

Timmar5Kostnader4Förfrågningar2Pre-Bill3Återbetalningar2Utdrag1
TNThandi Nkosi02/11 till 08/11
PvPieter van Wyk02/11 till 08/11
APAyesha Patel02/11 till 08/11
LBLiam Botha02/11 till 08/11
NMNaledi Mokoena02/11 till 08/11
Thandi Nkosi · 02/11 till 08/11Nivå 1 av 2
Denna vecka: Loggad 37:45 · billable 36:00 · clocked 40:15 · betald 40:00
ArbeteFakturerbarBetygI Fakturan
Logo system and lockupsBrand Refresh · Table Mountain Aerial Cableway14:30R 950,00R 13 775,00
Signage familyBrand Refresh · Table Mountain Aerial Cableway9:00R 950,00R 8 550,00
Bottle label artworkPackaging · Fynbos Gin Company8:30R 875,00R 7 437,50
Print proofs with the printerPackaging · Fynbos Gin Company4:00R 875,00R 3 500,00
Directional sign drawingsWayfinding · V&A Waterfront3:30R 900,00R 3 150,00
GodkännAvvisaBegär ändringarDelegera

Your Own Routing

velocity.calistoco.com/velocity/settings/approvals

Godkännanden

Vem godkänner varje typ av artikel, i vilken ordning, och över vilket belopp. Beslut fattas i Godkännanden och på varje artikel.

NivåGäller för objekt ovanGodkänd avNär flera personer frågas
Nivå 1Varje sak, oavsett mängd.Lea Brunner, Marco KellerDe personer jag angerThe first to answer decides
Nivå 2CHF 5'000The adminsEn rollOne approval is enough
Nivå 3CHF 25'000ÄgarenEn rollEveryone approves
Lägg till en nivåSpara

Approvers by person, money group or role, in order and levels, with thresholds per currency.

Medan du är borta

velocity.calistoco.com/velocity/review

Granska

Det som väntar på dig, med dess sammanhang bredvid

ADWeek of Can ÖztürkKadıköy Metro Station · Structural Survey · För Ayşe Demir, medan de är bortaTimmar
ADExpense report, Deniz AksoySite visits, Bursa · För Ayşe Demir, medan de är bortaKostnader
ADTravel request, Mert YılmazClient meeting, Ankara · För Ayşe Demir, medan de är bortaFörfrågningar
ADWrite-down, facade calculationsGalata Hotel Extension · För Ayşe Demir, medan de är bortaPre-Bill
ADStatement ST-0412, Anadolu İskele Ltd.Scaffolding, March · För Ayşe Demir, medan de är bortaUtdrag
Medan du är borta
Välj någon som bestämmer dina godkännanden under en stund. Det som väntar på dig dyker upp också i deras Godkännanden, och deras beslut registreras som gjort för dig.
Emre Kaya · Allt · 09/11 till 23/11Avsluta nu

Someone decides your approvals while you are away, and an item nobody answers goes to someone else after a while.

Reminders, With Automations

automations.calistoco.com/rules

Automatiseringar

Tell a person their timer is still runningSet up by Velocity. When someone’s timer is still running at the end of the day it started on, or ten hours after it started, whichever comes first, they hear it on their phone and in the app, with Stop Timer.
Remind a person to hand in their weekSet up by Velocity. At 5 pm on the last day of your week, everyone with time that week who has not handed it in hears it on their phone and in the app, with Submit Week.

Timer Still Running and Week Not Submitted, each a rule you can turn off.

A Week Signed Off

velocity.calistoco.com/velocity/my-week

Min vecka

Marcus Reyes

11/09/2026 till 11/15/2026 · Återställd för ändringar

Skicka vecka
Skickat tillbaka: Move Thursday’s framing hours to the Lakeway kitchen, not the Barton Hills deck.
ArbeteMon 9Tue 10Wed 11Thu 12Fri 13Totalt
Framing, second floorKitchen Remodel · Lakeway6:005:307:004:006:0028:30
Deck framing and joistsDeck Build · Barton Hills2:002:301:004:002:0011:30
Material pickupKitchen Remodel · Lakeway0:300:300:300:300:302:30
Earlier Weeks
VeckaStatus
11/02 till 11/08AvslutatLåst
10/26 till 11/01AvslutatLåst
10/19 till 10/25AvslutatLåst

Locked once approved; sent back, it opens again with the reviewer’s note.

Paid Back, With Workforce

velocity.calistoco.com/velocity/expenses/reimbursements

Kostnader

Kostnadsrapporter, varje kostnad med dess kvitto eller mil, och vad folk är skyldiga.

RapporterKostnaderÅterbetalningar
PersonSkulderKostnaderBetaltStatus
WKWanjiru KamauKsh 18,450.004I LönerapportenNext Pay Report
OOOtieno OdhiamboKsh 7,200.002I LönerapportenNext Pay Report
AHAmina HassanKsh 31,900.006Paid DirectlyTo Pay
BMBrian MwangiKsh 4,350.001I LönerapportenNext Pay Report
GAGrace AchiengKsh 12,780.003Paid DirectlyPayable Written

A line on the pay report your payroll takes, or a payable through Ledger.

Contractor Statements

velocity.calistoco.com/velocity/review?tab=statements
Timmar3Kostnader2Förfrågningar1Pre-Bill2Återbetalningar1Utdrag1
ST-2031 · Southbank Irrigation Pty LtdBetala avtal: Irrigation Install, Call-Out
Drip irrigation, front garden
$2,840.00
Controller and rain sensor
$1,260.00
Call-out, valve fault
$760.00
Pop-up sprinklers, back lawn
$1,940.00
Backflow valve test and certificate
$380.00
Skuldsatt $7,180.00 · avdrag $359.00 · att betala $6,821.00
GodkännAvvisaBegär ändringar

Signed off, then posted as the statement’s own payable in Ledger.

Projekt

Run each project in phases, on one page

A project is client work or internal work, opened by hand, from a won deal or a contract, or for a record such as a development or a location. Its page opens on where it stands, the next milestone and its margin.

All Projects

Every project with its hours, what is to invoice, its profit and margin, by status, owner, type or client.

velocity.calistoco.com/velocity/projects

Projekt

Every project: its hours, its costs, what it has billed and what it earned

Ny projekt
All ProjectsBy StatusPer ägarePer typBy Client
I Progress9
Med arbete att fakturera6
Loggade timmar1,284
Stängd14
ProjektKlient & Leverantör InkorgTimmarTill fakturaVinstMarginal % (tomt = din marginal för valutan)Status
Brand RefreshTMC-03 · Table Mountain Aerial CablewayTable Mountain Aerial Cableway386.5R 48 750R 212 00068.4%Pågående
PackagingFGC-11 · Fynbos Gin CompanyFynbos Gin Company142R 21 400R 96 00061.2%Pågående
VägmärkningVAW-07 · V&A WaterfrontV&A Waterfront251.5R 33 600R 140 00057.9%Pågående
Annual ReportSAN-26 · Sanlam FoundationSanlam Foundation88R 12 200R 72 00052.3%Väntar på kunden
Menu and SignageBWB-02 · Bree Street Wine BarBree Street Wine Bar61.5R 8 150R 38 00034.6%Pågående
WebbplatsKRB-05 · Kirstenbosch Botanical SocietyKirstenbosch Botanical Society102R 6 400R 124 00063.8%Slutförd

Tidslinje

A Gantt of tasks and milestones; a move with dependents lists each new date for you to decide.

velocity.calistoco.com/velocity/projects/cp-11/timeline

Casa Patio · Chapinero Pågående

CP-11 · Familia Restrepo Gómez

Starta tidtagareLoggtidFakturering
ÖversiktTidslinjeMilestonesUppgifterKey Dates & ConditionsFesterDokumentUppdateringarÄndra orderBudgetTime & CostsFaktureringSite Controls
SkalaDagVeckaMånadTidigareIdagSenare
Plan22/1029/105/1112/1119/1126/113/1210/1217/12
Concept Design
Concept Approved by the Client◆
Developed Design
Structural Coordination
Planning Submission◆
Interior Design
Construction Drawings
Tender Issued◆
This Move Has Dependents

Developed Design moves to 05/11/2026 – 03/12/2026. What waits on it would move too:

Planning Submission
29/11/2026 → 06/12/2026
Construction Drawings
29/11/2026 → 06/12/2026
Tender Issued
17/12/2026 → 24/12/2026
AvbrytJust This OneFlytta Alla

Milestones

Payments fall due as a milestone is reached, or once the client approves it.

velocity.calistoco.com/velocity/projects/wf-08/milestones

Booking App · Waiheke Ferries Pågående

WF-08 · Waiheke Ferries Ltd

Apply a Milestone Plan…Lägg till milstolpe
ÖversiktTidslinjeMilestonesUppgifterKey Dates & ConditionsFesterDokumentUppdateringarÄndra orderBudgetTime & CostsFaktureringSite Controls
MejlstolpeMålAnsvarigFramsteg %StatusPayments Due On It
Discovery Signed Off25/09/2026Aroha Ngata100%Slutförd$18,000.00
Design Approved23/10/2026Liam Te Rangi100%Slutförd$24,000.00
Beta in Testers’ Hands18/11/2026Mia Thompson70%Pågående$32,000.00
Payments Live in the App28/11/2026Jack Wilson35%Försenad$16,000.00
Store Listing Approved09/12/2026Mia Thompson20%Pågående$8,000.00
Store Launch16/12/2026Aroha Ngata10%Inte påbörjad$22,000.00
Client Sign-Off and Handover23/12/2026Aroha Ngata5%Inte påbörjad$12,000.00

What If It Slips

The milestones and payments a delay would move, across projects, moving nothing.

velocity.calistoco.com/velocity/projects/twr-3/milestones

Water Reclamation · Tuas Plant Pågående

TWR-3 · Tuas Utilities Pte Ltd

Starta tidtagareLoggtidFakturering
ÖversiktTidslinjeMilestonesUppgifterKey Dates & ConditionsFesterDokumentUppdateringarÄndra orderBudgetTime & CostsFaktureringSite Controls
MejlstolpeMålStatusPayments Due On It
Mechanical Installation Complete09/11/2026Försenad$240,000.00
Pump Station Commissioned24/11/2026Pågående$186,000.00
Control Room Handover12/12/2026Inte påbörjad$94,000.00
Performance Test Passed26/12/2026Inte påbörjad$120,000.00
Final Acceptance11/01/2027Inte påbörjad$150,000.00
What If It Slips

See what a delay would move: the milestones waiting on it and the payments due on them. Nothing changes.

A slip of 14 days moves 3 milestones waiting on it and 3 payments due on them, 1 past a guarantee. Nothing has changed: move each one yourself.

MejlstolpeMålPayments Due On It
Pump Station CommissionedWater Reclamation · Tuas Plant24/11/2026 → 08/12/2026$186,000.00
Control Room HandoverWater Reclamation · Tuas Plant12/12/2026 → 26/12/2026$94,000.00
Integrated Systems TestData Hall B · Jurong Campus23/12/2026 → 06/01/2027$68,000.00
Visa

Uppgifter

Each charged by the hour, at a fixed amount or not at all, its estimate beside the hours logged.

velocity.calistoco.com/velocity/projects/dvp-14/tasks

Bridge Rehabilitation · Don Valley Parkway Pågående

DVP-14 · City of Toronto

Lägg till uppgift
ÖversiktTidslinjeMilestonesUppgifterKey Dates & ConditionsFesterDokumentUppdateringarÄndra orderBudgetTime & CostsFaktureringSite Controls
UppgiftAvgifterEget prisBeräknad timmarLoggad timmarTill fakturaTilldelad
Bearing inspection, north abutmentOwen ParkTime: per hour$180 / h2422.5$1,350.00Owen Park
Load rating modelHannah ClarkeTime: per hour$180 / h4036$1,980.00Hannah Clarke
Deck condition surveyOwen ParkTime: per hour$165 / h3230.5$1,485.00Owen Park
Traffic management planMaya SinghFast belopp$4,8001816$4,800.00Maya Singh
Rehabilitation drawings, phase 1Daniel FortinTime: per hour$165 / h6041.5$2,310.00Daniel Fortin
Weekly coordination with the CityHannah ClarkeNon-chargeableNon-chargeable129.5Non-chargeableHannah Clarke

Projects Inside Projects

A building with a project per unit, each with its own client and schedule.

velocity.calistoco.com/velocity/projects/ea-1240/milestones

Edificio Alameda 1240 Pågående

EA-1240 · Inmobiliaria Alameda

Inside a Project…New Project Inside
ÖversiktTidslinjeMilestonesUppgifterKey Dates & ConditionsFesterDokumentUppdateringarÄndra orderBudgetTime & CostsFaktureringSite Controls
Projects Inside
ProjektKlient & Leverantör InkorgStatusDeadlineTill fakturaFakturerad
Depto 101Camila FuentesCamila FuentesSlutförd31-10-2026$7.425.000$148.500.000
Depto 204Matías Rojas VidalMatías Rojas VidalPågående30-11-2026$24.750.000$99.000.000
Depto 305Valentina SotoValentina SotoPågående15-12-2026$31.200.000$87.600.000
Depto 402Sebastián MuñozSebastián MuñozPågående29-12-2026$18.900.000$62.300.000
Depto 503Isidora PérezIsidora PérezPågående12-01-2027$12.400.000$41.800.000
Depto 604Tomás RiquelmeTomás RiquelmePågående19-01-2027$15.800.000$36.500.000
Local Comercial 1Café Altamira SpACafé Altamira SpAPågående26-01-2027$9.600.000$28.900.000

Client Updates, With Navigator

Updates with progress photos, shared tasks and milestones to approve in their portal.

velocity.calistoco.com/velocity/projects/tor-4/updates

Garden Rebuild · 14 Toorak Road Pågående

TOR-4 · Hannah and James Whitfield

Post Update…
ÖversiktTidslinjeMilestonesUppgifterKey Dates & ConditionsFesterDokumentUppdateringarÄndra orderBudgetTime & CostsFaktureringSite Controls
DagUppdateraBilderKlient & Leverantör Inkorg
11/11Turf laid on the back lawn; the irrigation runs on its timer from tonight.6Delat
08/11Sandstone steps set and the retaining wall capped.4Delat
04/11Native planting along the fence line: 40 grevilleas and kangaroo paw.8Delat
31/10Drainage under the terrace re-routed after the rain; no change to the date.3Kept Back
28/10Deck framing up; the spotted gum boards arrive Monday.5Delat
24/10Old pavers lifted and the side path levelled for the new gravel.4Delat

From a Won Deal, With Deals

The deal’s tasks become the project’s first tasks, one project per deal.

velocity.calistoco.com/velocity/projects/new?dealId=bcr-spring

Ny projekt

Plan the work, track its time and costs, and bill it when it is for a client

AvbrytÖppna Projekt
Add the agreed lines as tasksCampaign strategy and media planThree creative routesSocial content, twelve weeksPaid media managementMonthly results report

Files, With Depot

The project’s files, and a photo or PDF shared from a phone straight onto it.

velocity.calistoco.com/velocity/projects/ssd-09/documents

Café Fit-Out · Seongsu-dong Pågående

SSD-09 · Onion Coffee Co., Ltd.

Starta tidtagareLoggtidFakturering
ÖversiktTidslinjeMilestonesUppgifterKey Dates & ConditionsFesterDokumentUppdateringarÄndra orderBudgetTime & CostsFaktureringSite Controls
Krävda dokumentSignaturerArkiv
NamnTypLades till
Floor plan, revision CDokument2026. 11. 11.
Counter and shelving elevationsDesign2026. 11. 10.
Rear wall before demolitionFil2026. 11. 10.
Lighting scheduleDokument2026. 11. 08.
Approved tile and timber samplesFil2026. 11. 07.
Walkthrough of the finished shopfrontVideo2026. 11. 06.
Fire permit applicationDokument2026. 11. 04.
velocity.calistoco.com/velocity/projects

Projekt

Every project: its hours, its costs, what it has billed and what it earned

Ny projekt
All ProjectsBy StatusPer ägarePer typBy Client
I Progress9
Med arbete att fakturera6
Loggade timmar1,284
Stängd14
ProjektKlient & Leverantör InkorgTimmarTill fakturaVinstMarginal % (tomt = din marginal för valutan)Status
Brand RefreshTMC-03 · Table Mountain Aerial CablewayTable Mountain Aerial Cableway386.5R 48 750R 212 00068.4%Pågående
PackagingFGC-11 · Fynbos Gin CompanyFynbos Gin Company142R 21 400R 96 00061.2%Pågående
VägmärkningVAW-07 · V&A WaterfrontV&A Waterfront251.5R 33 600R 140 00057.9%Pågående
Annual ReportSAN-26 · Sanlam FoundationSanlam Foundation88R 12 200R 72 00052.3%Väntar på kunden
Menu and SignageBWB-02 · Bree Street Wine BarBree Street Wine Bar61.5R 8 150R 38 00034.6%Pågående
WebbplatsKRB-05 · Kirstenbosch Botanical SocietyKirstenbosch Botanical Society102R 6 400R 124 00063.8%Slutförd
Site and Subcontractors

Keep each project’s site records and subcontracts

The Daily Log is the day’s diary, with an order book where your country keeps one. Questions go out as numbered requests for information, sign-offs and the handover close the work, and Delivery shows each board across every project.

velocity.calistoco.com/velocity/delivery/daily-log

Daily Log

Each day of the work, the instructions given on site and the incidents.

Add Photos…Ny inmatning
Inlägg6
Ordningar utfärdade1
Väntar på underskrift1
Förlorade timmar3
All EntriesVäntar på underskrift
DatumBokaTypProjektInskrivningBesättningVäder
30/10/2026Order BookBeställningHeating Upgrade · Riverside Business CentreThe two meeting-room radiators move to the new partition positions, as confirmed in RFI 3.Väntar på underskrift2Dry
30/10/2026DiaryDaily entryRewire and New Consumer Unit · 281 High RoadFirst fix finished in every room; the plasterer can start on Monday.2Dry
30/10/2026DiaryDaily entryHeating Upgrade · Riverside Business CentreThe client asked to keep the meeting room warm until Friday; its radiator stays on until then.2Showers
29/10/2026DiaryDaily entryHeating Upgrade · Riverside Business CentreGround floor started: reception and the two offices cleared for us.3Rain all day
24/10/2026DiaryDaily entryHeating Upgrade · Riverside Business CentreFirst floor finished: the system filled and tested with no leaks.3Dry and cold
24/10/2026IncidentsHändelse #Heating Upgrade · Riverside Business CentreThe second boiler was held at the merchant; the crew moved to first-floor snagging, three hours lost.3Dry and cold

Requests for Information

Numbered questions with a due day, what each holds up and what it does to the schedule or cost.

velocity.calistoco.com/velocity/delivery/rfis

Requests for Information

Questions with an owner, a deadline and the work they hold up.

Ny begäran
Öppna3
Fördröjd1
Moving the Schedule2
Väntar på dig1
#FrågaDueHolds UpSchemaKostnadStatus
7Can the plant room door open outwards for the second boiler?Mejlstolpe · Plant Room Ready10/11/2026MejlstolpePlant Room ReadyJaJaÖppna
6Which wall takes the new consumer unit in the kitchen?Arbetsorder · WO-2291 · 14 Maple Grove15/11/2026ArbetsorderWO-2291 · 14 Maple GroveNejNejÖppna
5Are the existing radiator valves kept on the first floor?Underentreprenad · Pipe insulation, plant room17/11/2026UnderentreprenadPipe insulation, plant roomNejJaÖppna
4Flue route through the east elevation: is scaffold access confirmed?Underentreprenad · Scaffold, east elevation03/11/2026UnderentreprenadScaffold, east elevationJaNejSvarad
3Meeting-room radiators: old or new partition positions?Mejlstolpe · First Fix Complete29/10/2026MejlstolpeFirst Fix CompleteJaJaStängd
2Is the client supplying the smart thermostats?Arbetsorder · WO-2240 · Riverside Business Centre22/10/2026ArbetsorderWO-2240 · Riverside Business CentreNejJaStängd
Avtal

Work a contract’s steps on the project that delivers it

A contract’s steps, conditions, parties, documents, signatures and deposits sit on its project. A coordinator works every contract from My Steps, Deadlines, At Risk and Documents In, each row opening its project.

Every contract you coordinate, step by step.

Mina steg

Every step due on you across your contracts, with each one’s Completion Date.

velocity.calistoco.com/velocity/contracts/my-steps

Mina steg

The Contract steps you hold, the soonest first.

Öppna steg9
Tidigare på deras dag1
StegAvtalSidanDueDatum för slutförande
Searches back from the councilPurchase · 12 Didsbury ParkPurchase · 12 Didsbury ParkKöpare sida11/11/202616/12/2026
Mortgage offer receivedPurchase · Flat 4, Ancoats MillPurchase · Flat 4, Ancoats MillKöpare sida14/11/202609/12/2026
Replies to enquiries sentSale and Purchase · 3 Chorlton GreenSale and Purchase · 3 Chorlton GreenBåda sidor15/11/202623/12/2026
Lease engrossed for signatureLease · Unit 7, Trafford ParkLease · Unit 7, Trafford ParkSäljarsida17/11/202601/12/2026
Exchange of contractsPurchase · 12 Didsbury ParkPurchase · 12 Didsbury ParkKöpare sida21/11/202616/12/2026
Completion statement to the clientSale and Purchase · 3 Chorlton GreenSale and Purchase · 3 Chorlton GreenBåda sidor24/11/202623/12/2026

Deadlines

Each contract’s next deadline and how many steps are late.

velocity.calistoco.com/velocity/contracts/deadlines

Deadlines

Every open Contract against its next deadline, a late step first.

Öppna7
Deadlines fördröjda2
Completing This Month3
AvtalStegNästa deadlineSena stegDatum för slutförandeDeadlines
Sale · 12 Kifisias Avenue, MarousiSäljarsidaTax clearance certificate10/11/2026230/11/2026Åtgärd krävs
Purchase · Apartment 4B, KolonakiKöpare sidaNotary deed drafted11/11/2026124/11/2026Åtgärd krävs
Lease · Shop 3, Ermou StreetBåda sidorLease signed16/11/2026Ingen21/11/2026På banan
Purchase · Villa, VouliagmeniKöpare sidaEngineer’s certificate18/11/2026Ingen09/12/2026På banan
Sale · Office floor, Syngrou AvenueSäljarsidaBuyer’s deposit received20/11/2026Ingen15/12/2026På banan
Purchase · Maisonette, GlyfadaKöpare sidaLand registry search23/11/2026Ingen27/12/2026På banan

I riskzonen

The step at risk, what is not covered and who holds it.

velocity.calistoco.com/velocity/contracts/at-risk

I riskzonen

Open Contracts with a late step, a deadline days away, no financing approval near completion, or a screening to review

Contracts at Risk5
Steg fördröjda2
Finansiering inte godkänd1
AvtalRiskStegDueHållen av
Compra · Apartamento 142, Vila MarianaKöpare sidaFinansiering inte godkändAprovação do financiamento18/11/2026Banco do Brasil
Venda · Casa, Alto de PinheirosSäljarsidaStep OverdueCertidões negativas entregues09/11/2026Construtora Vila Mariana Ltda
Compra · Sala Comercial, Faria LimaKöpare sidaDeadline SoonEscritura assinada14/11/2026Cartório do 15º Tabelião
Locação · Loja 8, Oscar FreireBåda sidorDeposits Over CoverCaução recebida16/11/2026Imobiliária Jardins
Compra · Cobertura, MoemaKöpare sidaCover Ends Before CompletionSeguro fiança renovado21/11/2026Porto Seguro

Tredjepartskoordinatörer

The contracts an outside coordinator works for you, beside your own.

velocity.calistoco.com/velocity/contracts/third-party

Tredjepartskoordinatörer

Avtal5
Samordnare3
SamordnareAvtalSidanKlartDatum för slutförande
LOLucía OrtegaCompraventa · Calle Velázquez 64Köpare sida75%24/11/2026
LOLucía OrtegaCompraventa · Paseo de la Habana 9Säljarsida40%08/12/2026
JMJavier MontesArrendamiento · Local en ChamberíBåda sidor90%17/11/2026
JMJavier MontesCompraventa · Ático en SalamancaKöpare sida55%01/12/2026
MIMarta IbáñezCompraventa · Chalet en PozueloSäljarsida25%20/12/2026
Fakturering

Review the work before it goes on an invoice

To Invoice lists every hour, fixed task and chargeable cost not yet billed, project by project. Write an item up or down or defer it, with the original kept, then invoice it with the time report attached. The invoice is Ledger’s.

velocity.calistoco.com/velocity/billing

Till faktura

Work and costs waiting to be invoiced, Project by Project

Ny faktura
Projekt att fakturera5
Timmar att fakturera273
Timmar utan sats4
ProjektKlient & Leverantör InkorgTimmarTill faktura
Bridge Rehabilitation · Don Valley ParkwayCity of Toronto96.5$17,370.00
Transit Hub Structural ReviewMetrolinx64$12,160.00
Warehouse Retrofit · MississaugaPeel Cold Storage Inc.48.5$8,730.00
Condo Tower Peer ReviewHarbourfront Developments38$7,220.00
Seismic Assessment · St. Michael’s WingUnity Health Toronto26$5,070.00
Artiklar som väntar
ArtikelDagTimmarInspelatTill BillBeslut
Load rating modelBridge Rehabilitation · Don Valley Parkway11-0711$1,980.00$1,485.00AvskrivetVäntar på godkännande
Site walk with the contractorTransit Hub Structural Review11-084$760.00$950.00Skrivet upp
Roof truss calculationsWarehouse Retrofit · Mississauga11-099.5$1,710.00$1,710.00Fakturerad senare
Comments on the podium transfer slabCondo Tower Peer Review11-106$1,140.00$912.00Avskrivet
Anchor pull-out testsSeismic Assessment · St. Michael’s Wing11-115$950.00$1,045.00Skrivet upp
velocity.calistoco.com/velocity/billing?adjust=1

Till faktura

Work and costs waiting to be invoiced, Project by Project

Ny faktura
Artiklar som väntar
ArtikelDagTimmarInspelat
Booking flow: room pickerWebsite Rebuild · Atlântico Hotels09/11121140,00 €
Room photography editWebsite Rebuild · Atlântico Hotels09/116.5617,50 €
Wine club sign-up flowBrand Site · Quinta do Vale Wines10/118760,00 €
Content entry, tasting notesBrand Site · Quinta do Vale Wines10/115475,00 €
Staff directory searchIntranet · Porto Port Authority11/119855,00 €
Innan det faktureras

Originalet behålls. En nedskrivning över din andel väntar på godkännande i Godkännanden.

Booking flow: room picker · 1140,00 €

Skriv nerWrite UpBill LaterDo Not Bill
AvbrytSpara

Change what an item bills, with what was recorded kept beside it.

One invoice for one client’s projects in one currency, the hours grouped by project, task or person.

Hours or an amount each week or month, or a prepaid balance, for a client, a project or a maintenance contract.

What an hour is sold as, by person, project or task, from the price engine.

A success fee, a capped fee, or the bills split between payers.

What the client bought, drawn down as the work delivers it.

Capacity and Reports

See who is free and what each project earns

Capacity sets each person’s planned hours against what their shifts let them work, week by week. Reports cost every hour by the same rule as Workforce’s pay report: profitability, utilization, cost against output, hire against freelance, budget burn and project margin, per currency.

velocity.calistoco.com/velocity/capacity

Kapacitet

Vad varje person kan arbeta med, vad de är tilldelade, och tiden de lämnade in.

Allmän tidLägg till projekt
TidigareDenna veckaSenareTillgänglig 816 h · Planerad 681 h · Faktisk 131 h
Person09/1116/1123/1130/11Totalt
ICInês CarvalhoDesign Lead34 / 3633 / 3630 / 3622 / 36119 h
TMTiago MendesDeveloper36 / 4044 / 4036 / 4032 / 40148 h
BCBeatriz CostaDeveloper24 / 2420 / 2418 / 2412 / 2474 h
RFRui FernandesInnehåll30 / 3228 / 3216 / 1626 / 32100 h
SASofia AlmeidaProject Manager26 / 3624 / 3628 / 3620 / 3698 h
DPDuarte PiresDeveloper32 / 4036 / 4040 / 4034 / 40142 h
Planned past their hoursTiago Mendes · 16/11

Profitability and Margin

What each project and client earns against the cost of every hour, per currency.

velocity.calistoco.com/velocity/reports/profitability

Rapporter

What the work earned and cost, and how the team’s hours were used, per currency.

VinstförmågaUtnyttjandeCost vs OutputHire vs FreelanceBudget BurnUrsprungsbildningRealiseringProject MarginOverdue & At RiskKommande deadlines
01/10/202631/10/2026By ClientExportera CSV
NamnTimmarFakturerbara timmarFaktureradKostnadVinstMarginal % (tomt = din marginal för valutan)
Grupo Altamira412386$1,544,000$861,000$683,00044%
Planta Bajío296274$1,096,000$642,500$453,50041%
Fondo Pacífico188181$814,500$401,200$413,30051%
Hoteles Riviera164139$556,000$398,700$157,30028%
Agro Norte121112$448,000$289,400$158,60035%
Cervecería del Valle8671$284,000$231,900$52,10018%

Utnyttjande

Each person’s billable share of the hours they worked.

velocity.calistoco.com/velocity/reports/utilization

Rapporter

What the work earned and cost, and how the team’s hours were used, per currency.

VinstförmågaUtnyttjandeCost vs OutputHire vs FreelanceBudget BurnUrsprungsbildningRealiseringProject MarginOverdue & At RiskKommande deadlines
01/10/202631/10/2026Per personExportera CSV
PersonTillgängligFärdigställdFakturerbarFakturerbar %Användningsgrad %Intäkter
WLWei Ling Tan15214813189%86%$27,510
APArjun Pillai15215613888%91%$26,910
SRSiti Rahman1201169279%77%$16,560
MLMarcus Lim15214010172%66%$18,180
HGHannah Goh15215012885%84%$21,120
DODaniel Ong76746182%80%$10,065

Budgetförbrukning

How fast each budget is being used against the time gone.

velocity.calistoco.com/velocity/reports/budget-burn

Rapporter

What the work earned and cost, and how the team’s hours were used, per currency.

VinstförmågaUtnyttjandeCost vs OutputHire vs FreelanceBudget BurnUrsprungsbildningRealiseringProject MarginOverdue & At RiskKommande deadlines
01/10/202631/10/2026By ClientExportera CSV
ProjektBeloppAnvändVänsterAnvänd %
Garden Rebuild · 14 Toorak Road$64,000$47,800$16,20075%
Rooftop Terrace · Collins Street$92,000$51,500$40,50056%
Courtyard · Fitzroy Townhouses$38,000$37,200$80098%
Native Garden · Eltham Primary School$27,500$12,400$15,10045%
Pool Surrounds · Brighton$71,000$60,300$10,70085%
Streetscape · Camberwell Junction$118,000$41,200$76,80035%

Origination and Realization

Who brought in what was billed, and how much of the time worked was paid.

velocity.calistoco.com/velocity/reports/origination

Rapporter

What the work earned and cost, and how the team’s hours were used, per currency.

VinstförmågaUtnyttjandeCost vs OutputHire vs FreelanceBudget BurnUrsprungsbildningRealiseringProject MarginOverdue & At RiskKommande deadlines
01/10/202631/10/2026Per personExportera CSV
PersonProjektUrsprunglig kreditFakturerad på deras projekt
Carolina Ruiz14$ 38.400.000$ 41.200.000
Martín Acosta11$ 26.900.000$ 29.750.000
Florencia Paz9$ 18.650.000$ 21.300.000
Gonzalo Ferreyra7$ 12.100.000$ 13.800.000
Julieta Benítez5$ 7.450.000$ 8.900.000
Realisering
ProjektArbetsvärdeFakturerat värdeFaktureringsrealisering %Insamlingsrealisering %
Molinos del Sur S.A.$ 9.800.000$ 9.310.00095%92%
Bodega Los Andes$ 7.600.000$ 6.840.00090%88%
Grupo Tandil$ 5.400.000$ 5.400.000100%97%
Clínica Belgrano$ 4.100.000$ 3.690.00090%90%
Pampa Energía Verde$ 3.900.000$ 3.280.00084%75%

Overdue and Upcoming

Late milestones and tasks, and the deadlines of the next 30, 60 or 90 days.

velocity.calistoco.com/velocity/reports/overdue

Rapporter

VinstförmågaUtnyttjandeCost vs OutputHire vs FreelanceBudget BurnUrsprungsbildningRealiseringProject MarginOverdue & At RiskKommande deadlines
VadNamnProjektDueDagar försenade
MejlstolpeFacade Samples ApprovedUmeda Office Tower Lobby2026/11/066
UppgiftLighting plan, level 3Kyoto Machiya Hotel2026/11/084
Contract StepFire Safety Sign-OffKobe Harbour Café2026/11/102
Document DueStructural SurveyNamba Clinic Fit-Out2026/11/111
UppgiftSignage artwork to the printerUmeda Office Tower Lobby2026/11/111
Kommande deadlinesNästa 30 dagar
DatumIn DaysVadNamnProjekt
2026/11/153MejlstolpeConcept PresentationNara Ryokan Renewal
2026/11/208UppgiftDoor schedule issuedNamba Clinic Fit-Out
2026/11/2412MejlstolpeTender Package IssuedKyoto Machiya Hotel
2026/12/0119Contract StepHandover InspectionKobe Harbour Café
2026/12/0826MejlstolpeFurniture Order PlacedUmeda Office Tower Lobby

Labor by Segment

Labor against sales, by department, event, room work, fulfillment or agent.

velocity.calistoco.com/velocity/reports/event-staffing

Rapporter

Labor vs SalesDepartment LaborOperating DaysEvent StaffingHousekeeping LaborMaintenance LaborFulfillment LaborAgent Output
01/10/202631/10/2026By ClientExportera CSV
HändelseFolkLönetimmarLönekostnadIntäkterLabor % of RevenueRevenue per Labor Hour
Boda Hernández Peña · Casa de Campo24212RD$148,400RD$1,240,00012.0%RD$5,849
Congreso Médico del Caribe38356RD$263,400RD$2,185,00012.1%RD$6,138
Festival Gastronómico Zona Colonial31274RD$189,100RD$1,560,00012.1%RD$5,693
Lanzamiento Banco Popular16118RD$94,400RD$865,00010.9%RD$7,331
Gala Benéfica Fundación Mar Azul22186RD$139,500RD$1,120,00012.5%RD$6,022
Concierto Anfiteatro Puerto Plata45392RD$282,200RD$2,410,00011.7%RD$6,148

Figures by Permission

Costs and billing follow each person’s money settings, or read Not shared with you.

velocity.calistoco.com/velocity/reports/profitability

Rapporter

What the work earned and cost, and how the team’s hours were used, per currency.

VinstförmågaUtnyttjandeCost vs OutputHire vs FreelanceBudget BurnUrsprungsbildningRealiseringProject MarginOverdue & At RiskKommande deadlines
01/10/202631/10/2026By ClientExportera CSV
NamnTimmarFakturerbara timmarFaktureradKostnadVinstMarginal % (tomt = din marginal för valutan)
Household Survey · Kisumu County184:30162:00Ksh 2,140,000Ej delad med digEj delad med digEj delad med dig
Mobile Money Study · Safaricom Foundation142:00136:30Ksh 1,785,000Ej delad med digEj delad med digEj delad med dig
Market Sizing · East Africa Breweries96:0088:00Ksh 1,120,000Ej delad med digEj delad med digEj delad med dig
Customer Panel · Nairobi Water71:3064:00Ksh 846,000Ej delad med digEj delad med digEj delad med dig
Brand Tracker · Twiga Foods58:0052:30Ksh 694,000Ej delad med digEj delad med digEj delad med dig
On a Phone

Run your own week from a phone, signal or not

Home on a phone is the timer in one tap, your own week and what waits on you. Time, a timer, an expense and a Daily Log entry made with no signal are held and sent once.

Hem

Your timer in one tap, what needs you, and your week so far.

Hastighet
Din Timer
Timer i gång00:47:12Boiler room surveyStoppa
Behöver dig
Väntar på dig3
Timer kvarstående1
Mina steg2
Din vecka
Inte inlämnadLoggad 28:15 · billable 25:45

My Week on a Phone

Your week day by day, handed in with Submit Week.

Min vecka
09/11 till 15/11 · Inte inlämnad
Mon 9Logo system and lockups7:30
Tue 10Signage family8:00
Wed 11Bottle label artwork7:15
Thu 12Print proofs with the printer6:30
Fri 13Directional sign drawings7:30
Totalt36:45
Skicka vecka

Without Signal

Time, a timer, an expense and a Daily Log entry made offline are held on the phone and sent once.

Hastighet
Spara på denna enhet. Den skickas när du är tillbaka online.
TidFraming · 3:30
TimerMaterial pickup · from 07:12
KostnadLumber yard · $412.60
Daily LogRain stopped work at 11:00
Denna enhet
Keep Velocity on this deviceVelocity is being kept on this device.

Add to Velocity

A photo, a PDF or words shared from the phone become a receipt, a project’s file or a log entry.

Add to Velocity
IMG_4182.jpgFoto
Where does it go?
A Receipt
A File on a Project
Dina projekt
Brand Refresh · Cableway
Packaging · Fynbos Gin
Annat öppna projekt
Wayfinding · V&A Waterfront
Annual Report · Sanlam

Buttons in the Notice

Stop Timer and Submit Week, from the notification itself.

18:04
VelocityYour timer is still runningStop it if you are done, or keep it running if you are still working.Stäng timer
VelocityHand in your weekYour hours for 02/11 till 08/11 are not handed in yet. Submit your week when it is ready.Skicka vecka

Widgetar

Waiting for a Decision and My Hours on Windows, never a money figure.

09:12
VelocityVäntar på beslut17Timmar5Kostnader4Förfrågningar2Pre-Bill3Återbetalningar2Utdrag1GranskaOpen VelocityUppdateraVelocityMy HoursNot handed in yetDenna vecka31:45Billable This Week27:30Idag6:15Starta tidtagareOpen VelocityUppdatera
Hastighet
Din Timer
Timer i gång00:47:12Boiler room surveyStoppa
Behöver dig
Väntar på dig3
Timer kvarstående1
Mina steg2
Din vecka
Inte inlämnadLoggad 28:15 · billable 25:45
Prisning

Inga inställningskostnader. Betala när du börjar använda.

For work billed by the hour or delivered in phases.

Calisto Ops

Billed for each person on a project team.

€55/user/mo

Included with Calisto Ops. Invoices are posted by Ledger and shifts are planned in Workforce, each priced on its own page.

Rekommenderat för dig

Fungerar bra tillsammans.

Calisto Ledger

Calisto Ops

Double-entry books set up your way, every Calisto app’s money posted to them, invoices and who owes, supplier bills read and matched, receipts as expenses, the bank reconciled, money held for others, and the statements your accountant files from.

Learn more →
€40/user/mo
Calisto Workforce

Calisto Ops

The schedule built from what is booked and when people can work, clock-in on any phone or a shared tablet, time off and timesheets signed off once, a pay report for your payroll and payslips back, labor rules, the team and hiring from your careers page.

Learn more →
€22/user/mo
Calisto Dispatch

Calisto Ops

Requests and work orders, tasks assigned by who is free and near, templates and recurring work, the team and its contractors, routes by road, service levels and analytics, and the day worked from a phone with no signal.

Learn more →
€65/user/mo
Calisto Automations

Calisto Ops

Rules that start from your Calisto apps, a schedule or a date and act across them all, every app’s automatic messages as rules, sequences that follow up until a person acts, and every run on record.

Learn more →
€55/user/mo
Calisto Deals

Calisto Commerce

The CRM: leads routed and claimed, a pipeline on your own stages, quotes as versions and the contracts they become, people and companies, the day’s follow-ups, the handoff after the sale, commissions and the forecast.

Learn more →
€55/user/mo
Calisto Proposals

Calisto Commerce

Designed proposals priced by a quote from your catalog, sent by email, text, WhatsApp or a link, then chosen, accepted, signed and paid on one link, with follow-up, change orders and analytics.

Learn more →
€0.85per proposal
Calisto Navigator

Calisto Navigator

A portal with its own journey and messages, each client’s own records, unlimited clients signing in without passwords, and its own domain.

Learn more →
€30/portal/mo
Calisto Registry

Calisto Commerce

Din Core-app visar allt som dina Commerce- och Ops-planer aktiverar.

Learn more →
2%of revenue

Så här jämförs Velocity

Spec Sheet

Allt inkluderat i Calisto Velocity.

Time
  • A timer started from Home in one tap or the Start Timer shortcut, and time logged after the fact in Time.
  • Time on a project’s task, on a work order, on a ticket or on no task at all, in the business the person works in.
  • Each entry billable or not, by the task’s default unless the person changes it.
  • Logged time counted one way: whole minutes, by the business’s rounding.
  • Time ▸ Entries and Time ▸ By Person, with today’s, this week’s, billable and not yet invoiced hours.
  • Required notes on an entry, when the business turns them on.
  • A Core app records time on its own work orders and jobs, and it comes back here (with Dispatch).
My Week
  • My Week: the person’s own week, clock and work time together, one block shown in Velocity, Today and Workforce.
  • A cell of the week typed straight in, and calendar events suggested as entries to accept or leave.
  • The week handed in once and signed off once on the approval engine, then locked; who may reopen it is a setting.
  • Week cadence per entry, weekly or per pay period, the week’s first day, and which hours count: the clock, the time, or both (with Workforce).
  • Timer Still Running and Week Not Submitted reminders, each an Automations rule of the team kind, on by default (with Automations).
Expenses
  • Every expense captured by the one receipt capture, the same in Ledger, Today and Velocity, and from the Vida circle (with Ledger).
  • Mileage claims by distance, in kilometers or miles, at each category’s rate in its own currency.
  • Per-diem rates, a receipt required above an amount in each currency, and categories, each a setting.
  • Expenses filed as they arrive, weekly or as a report, by the business’s submission setting.
  • Expense reports: whose, which week, where each stands and what it comes to, one total per currency.
  • Each expense reimbursed to the person, billed to a client project or kept as a cost.
  • Reimbursements as a line on Workforce’s pay report, or a payable to the person through Ledger (with Workforce and Ledger).
Requests
  • Travel requests asked before the trip, with the days away, the destination and the estimate in its own currency.
  • Travel above the business’s amount is held until a travel request is approved.
  • The trip’s expenses set against the request, and what was spent read from them.
  • A purchase asked as a draft purchase order, on the purchase order’s own approval (with Ledger).
Review
  • One review desk for every decision about work and spend, the same items as the Approvals panel in the person’s menu.
  • The person-week, expense reports, expenses as they arrive, travel requests, pre-bill write-downs and contractor statements.
  • Each decision shown with its context beside it: the week’s hours, the report’s lines, the invoice or statement it touches.
  • Approvers by person, money group or role, their order and levels, thresholds per currency, delegation, timeout and escalation.
  • Contractor statements signed off, then posted as the statement’s own payable (with Ledger).
Projects
  • Client work or internal work: internal work takes time, expenses, bills and work orders as cost and is never billed.
  • Projects as a list and by status, owner, type and client, the same workspace in every app that shows projects.
  • A project opened by hand, from a contract, a Talent tour, a won deal, a request won through World, Local or Calisto Agency, or for a record (with Deals and Talent).
  • A project for a record: a development’s build, a location’s fit-out, an event’s production; the record lists its projects.
  • Status planned, in progress, on hold, completed or cancelled, and closed, which takes no new time, costs or invoices until reopened.
  • The project page: Overview, Timeline, Milestones, Tasks, Key Dates and Conditions, Parties, Documents, Updates, Change Orders, Budget, Time and Costs, Billing, Site Controls and Details, each shown when it holds something.
  • The same project page in Ledger, Trades, Legal, Talent, Creators, Listings, Events and Stays, in each app’s words.
  • Projects inside projects: a building with a project per unit, a season with each wedding, each with its own client and schedule.
  • Margin and Margin % against the project’s price, and Profit on what was invoiced, in the project’s own currency; unknown when an hour has no pay rate.
  • A project’s files from Depot on its card (with Depot).
Schedule and Milestones
  • Timeline: the Gantt of the project’s tasks and milestones, with links, a today line and Day, Week or Month.
  • A bar dragged, resized or moved by arrow keys; a move with dependents lists each one’s old and new date for Move All or Just This One.
  • On a phone, the Timeline is a list by date, grouped by week.
  • Milestones with a target day, the day reached, progress, a status, who is responsible and the milestone each waits on.
  • Mark Complete: the payments waiting on a milestone fall due with it.
  • A milestone the client approves waits on them; sent back, it is open work again with their reason.
  • What If It Slips: the milestones and payments a delay would move, across projects, moving nothing.
  • The payment schedule of a contract’s project: a payment tied to a day or a milestone, Split the Balance and Apply a Milestone Plan.
Clients
  • Updates for the client: posted with the milestone reached and progress photos, shared or kept back (with Navigator).
  • Draft With Calisto writes an update from what the project recorded since the last one, never a price or a name, and saves nothing.
  • Tasks shared with the client, on their portal’s board by status and the project calendar (with Navigator).
  • Required documents asked of a party, sent, accepted or sent back with a reason, every step dated.
  • The client’s approvals and sendings-back emailed by Automations rules (with Automations).
Contracts
  • A contract’s steps, conditions, documents, signatures and money lines worked on its project.
  • My Steps, Deadlines, At Risk, Documents In, Third-Party Coordinators and Deposits, across every contract, each row opening its project.
  • One party list per project: organization, in-house person and whom each represents.
  • Deposits held by a party of the project, with their guarantee or insurance, cover and expiry; At Risk flags a deposit past its cover.
  • Contract steps added from the account’s steps for a kind of contract.
  • Change orders: approve, reject with a reason, send for signature and execute; executing moves the contract’s value, the payment schedule, the cost line and the milestones it names (with Sign).
Site and Subcontractors
  • Requests for Information, numbered per project, with an owner, a deadline and the work each blocks.
  • The Daily Log: the day’s diary, and an order book of orders and site visits signed by their issuer and counter-signed, on where the country keeps one.
  • Sign-offs of a scope of work, passed or failed through the Approvals panel.
  • Handover of the finished work, its keys and documents.
  • Subcontracts as pay agreements: a fixed fee, a cost line, a work scope, the documents required before going on site and its signature.
  • Variations decided in Approvals and owed on the payee’s statement; retentions held and released on the statements, never past their cap.
  • Delivery: every project’s RFIs, Daily Log, Subcontracts, Retentions, Sign-Offs and Handover on one board each.
  • One budget: hours or money for the project, a task or a person, or cost lines with planned, committed, spent and the cost to complete.
Billing
  • To Invoice: every item of work not yet invoiced, with its decision on its row.
  • Pre-bill review: written up or down, or deferred, the original kept; a write-down above the business’s share waits in Review.
  • Invoices grouped by project, with the time report attached, several projects on one invoice when they share a currency (with Ledger).
  • Rates: the price engine’s adjustments by person, project or task, and Service Prices, the services an hour is sold as.
  • Fee terms: a success fee on the deal’s value, a capped fee and split billing between payers.
  • Retainers: an allowance of hours or of an amount per week or month, for a client, a project or a maintenance contract, with a warning share, rollover and cap, warn or bill.
  • Packages: inclusions the client bought, drawn down by the tasks that deliver them or by Record Use, each use dated (with Registry).
  • Deposits and the payment schedule’s instalments on a contract’s project.
  • Research, from the project: a legal research service opened with the client-matter number, and its cost-recovery file imported as disbursements.
  • Export files in Xero’s and QuickBooks’ import formats for books kept elsewhere; no sync.
Capacity and Reports
  • Capacity: people across projects and weeks, planned against what each can work from their shifts or pattern, and anyone planned past their hours.
  • Profitability, Utilization, Cost Against Output, Hire Against Freelance and Budget Burn, every cost by the one labor-cost rule Workforce’s pay report uses.
  • Origination and Realization, per currency, with ethical walls applied.
  • Project Margin, Overdue and At Risk, Upcoming Deadlines, Yield by Type and Change-Order Value.
  • Each segment’s labor report: labor against sales, department labor, operating days, event staffing, housekeeping, maintenance, fulfillment and agent output.
  • Trades’ work reports by crew, service and location, and Events’ Shows against their budgets (with Trades and Events).
  • Every report per currency, totals never converted.
Home and Phone
  • Home: what waits on you, hours this week and billable, open projects, projects to invoice, budgets at an alert, people planned past their hours and timers left running.
  • Tabs: Home, My Week, Review and Projects; Contracts, Delivery and the rest under More.
  • Shortcuts: Start Timer, Log Time, New Expense, My Week, Review and New Project.
  • Home, My Week, Time, Expenses and the Daily Log open with no signal; time, a timer, an expense and a Daily Log entry made offline are sent once.
  • Add to Velocity: a photo, a PDF or words shared from the phone become a receipt, a project’s file or a Daily Log entry.
  • Timer Still Running carries Stop Timer and Week Not Submitted carries Submit Week.
  • Waiting for a Decision and My Hours widgets on Windows, counts and hours only.
Settings and Access
  • One settings page: Approvals, the week, expenses, billing, budgets and capacity, projects, contractor statements, contract steps, delivery and research.
  • Every figure follows the reader’s money settings: billing under Look up payments, costs, margin and profit under See costs; a withheld figure reads Not shared with you.
  • Other people’s timers listed only to someone the owner lets see colleagues.
  • A freelancer works in their own account, on their own project, and invoices the client; nothing is written into the client’s account.
  • A one-time import of clients, projects, rates, time, expenses and invoices at pro.calistoco.com/switch.
Ärliga svar

Questions about Calisto Velocity

No. Time is recorded where the work happens: on a work order in Dispatch or a Core app, on the clock in Workforce, or with the timer on Velocity’s phone Home. A receipt is captured from Ledger, Today or the Vida circle on every page. All of it comes back to Velocity to be reviewed.

It is locked, and its billable hours wait in To Invoice. Write them up or down or defer them, with the original kept beside the change, then invoice them grouped by project with the time report attached. The invoice is Ledger’s.

As your business sets it: a line on Workforce’s pay report, which your payroll provider takes, or a payable to the person through Ledger. An expense can instead be billed to a client project or kept as a cost.

The project’s own. Several projects go on one invoice only when they share a currency, every report gives one total per currency, and nothing is converted.

No. A project is client work or internal work. Internal work takes time, expenses and bills as cost and reads its budget the same way, and every billing step refuses it.

No. Ledger posts what Velocity decides, and Workforce gathers the hours for your payroll. If your books are kept elsewhere, export the files your accounting software imports.

Velocity is included with Calisto Ops, or billed for each person on a project team. Both are in the pricing section on this page, read from the live catalog.