Calisto Velocity

Run every project, and bill the work it takes.

Plan a project in phases, record its time and receipts where the work happens, and decide what goes on the client’s invoice.

For client work and internal work.

velocity.calistoco.com/velocity/projects/atl-24

Website Rebuild · Atlântico Hotels In progress

ATL-24 · Atlântico Hotels Group

Start TimerLog TimeInvoice…
OverviewTimelineMilestonesTasksKey Dates & ConditionsPartiesDocumentsUpdatesChange OrdersBudgetTime & CostsBillingSite Controls
Where It Stands
Status
In progress
Client
Atlântico Hotels Group
Started
10/09/2026
Deadline
21/12/2026
What Is Waiting
To Invoice
14 464 €
Documents to Review
2
Open Requests for Information
1
Awaiting Counter-Signature
1
Booking Flow Built19/11/2026CompletedPayments Due On It: 24 000 €
Content Migrated03/12/2026In progressPayments Due On It: 18 000 €
Launch and Handover21/12/2026Waiting on the clientPayments Due On It: 30 000 €
Estimate96 000 €
Invoiced48 000 €
To Invoice14 464 €
Margin %42.4%
Direct Costs3860 €
Labor Cost31 420 €
Profit26 970 €
Margin40 720 €
Velocity
Your Timer
Time logged.02:14:48Booking flow: room pickerStart Timer
Needs You
Waiting on You4
Timers Left Running1
My Steps2
Your Week
Not submittedLogged 31:45 · billable 27:30
Marlow & Finch · LisbonWebsite Rebuild · Atlântico HotelsIn progress◆◆◆Margin %42.4%To Invoice14 250,00 €
Estudio Calderón · BogotáCasa Patio · ChapineroIn progress◆◆◆Margin %36.1%To Invoice$ 48.600.000
Fitzgerald Heating & Electrical · CorkHeating Upgrade · Riverside Business CentreIn progress◆◆◆Margin %28.7%To Invoice€3,562.50
Lakeshore Consulting Engineers · TorontoBridge Rehabilitation · Don Valley ParkwayIn progress◆◆◆Margin %33.8%To Invoice$17,370.00
Barros Lima Advogados · São PauloCompra · Apartamento 142, Vila MarianaWaiting on the client◆◆◆Margin %51.2%To InvoiceR$ 18.400,00
Kōwhai Digital · AucklandBooking App · Waiheke FerriesDelayed◆◆◆Margin %31.5%To Invoice$32,000.00
Caribe Producciones · Santo DomingoCongreso Médico del CaribeIn progress◆◆◆Margin %22.9%To InvoiceRD$865,000.00
Tanaka Design Office · OsakaKyoto Machiya HotelIn progress◆◆◆Margin %38.4%To Invoice¥4,280,000
Marlow & Finch · LisbonWebsite Rebuild · Atlântico HotelsIn progress◆◆◆Margin %42.4%To Invoice14 250,00 €
Estudio Calderón · BogotáCasa Patio · ChapineroIn progress◆◆◆Margin %36.1%To Invoice$ 48.600.000
Fitzgerald Heating & Electrical · CorkHeating Upgrade · Riverside Business CentreIn progress◆◆◆Margin %28.7%To Invoice€3,562.50
Lakeshore Consulting Engineers · TorontoBridge Rehabilitation · Don Valley ParkwayIn progress◆◆◆Margin %33.8%To Invoice$17,370.00
Barros Lima Advogados · São PauloCompra · Apartamento 142, Vila MarianaWaiting on the client◆◆◆Margin %51.2%To InvoiceR$ 18.400,00
Kōwhai Digital · AucklandBooking App · Waiheke FerriesDelayed◆◆◆Margin %31.5%To Invoice$32,000.00
Caribe Producciones · Santo DomingoCongreso Médico del CaribeIn progress◆◆◆Margin %22.9%To InvoiceRD$865,000.00
Tanaka Design Office · OsakaKyoto Machiya HotelIn progress◆◆◆Margin %38.4%To Invoice¥4,280,000
Marlow & Finch · LisbonWebsite Rebuild · Atlântico HotelsIn progress◆◆◆Margin %42.4%To Invoice14 250,00 €
Estudio Calderón · BogotáCasa Patio · ChapineroIn progress◆◆◆Margin %36.1%To Invoice$ 48.600.000
Fitzgerald Heating & Electrical · CorkHeating Upgrade · Riverside Business CentreIn progress◆◆◆Margin %28.7%To Invoice€3,562.50
Lakeshore Consulting Engineers · TorontoBridge Rehabilitation · Don Valley ParkwayIn progress◆◆◆Margin %33.8%To Invoice$17,370.00
Barros Lima Advogados · São PauloCompra · Apartamento 142, Vila MarianaWaiting on the client◆◆◆Margin %51.2%To InvoiceR$ 18.400,00
Kōwhai Digital · AucklandBooking App · Waiheke FerriesDelayed◆◆◆Margin %31.5%To Invoice$32,000.00
Caribe Producciones · Santo DomingoCongreso Médico del CaribeIn progress◆◆◆Margin %22.9%To InvoiceRD$865,000.00
Tanaka Design Office · OsakaKyoto Machiya HotelIn progress◆◆◆Margin %38.4%To Invoice¥4,280,000
Marlow & Finch · LisbonWebsite Rebuild · Atlântico HotelsIn progress◆◆◆Margin %42.4%To Invoice14 250,00 €
Estudio Calderón · BogotáCasa Patio · ChapineroIn progress◆◆◆Margin %36.1%To Invoice$ 48.600.000
Fitzgerald Heating & Electrical · CorkHeating Upgrade · Riverside Business CentreIn progress◆◆◆Margin %28.7%To Invoice€3,562.50
Lakeshore Consulting Engineers · TorontoBridge Rehabilitation · Don Valley ParkwayIn progress◆◆◆Margin %33.8%To Invoice$17,370.00
Barros Lima Advogados · São PauloCompra · Apartamento 142, Vila MarianaWaiting on the client◆◆◆Margin %51.2%To InvoiceR$ 18.400,00
Kōwhai Digital · AucklandBooking App · Waiheke FerriesDelayed◆◆◆Margin %31.5%To Invoice$32,000.00
Caribe Producciones · Santo DomingoCongreso Médico del CaribeIn progress◆◆◆Margin %22.9%To InvoiceRD$865,000.00
Tanaka Design Office · OsakaKyoto Machiya HotelIn progress◆◆◆Margin %38.4%To Invoice¥4,280,000
Lakeshore Consulting Engineers · TorontoMy WeekPriya RamanSigned offPaid Hours38:30To Invoice$6,650.00
Kōwhai Digital · AucklandMilestonesDesign ApprovedCompletedPayments Due On It$24,000.00
Marlow & Finch · LisbonItems WaitingBooking flow: room pickerWritten DownRecorded1140,00 €To Bill855,00 €
Al Noor Interiors · DubaiChange OrdersTwo extra meeting podsExecutedPrice Change+AED 42,600.00
Barros Lima Advogados · São PauloRequired DocumentsComprovante de RendaAcceptedRequested FromFernanda Albuquerque
Okafor & Partners · LagosRetainersLekki Marine Services LtdNearly UsedLeft2 hAmount Left₦90,000
Mensah & Co. Chartered Accountants · AccraExpensesOsu Office SuppliesApprovedGoes ToBilled to the clientAmountGH₵842.00
Harcourt Lane Solicitors · ManchesterDepositsPurchase · 88 Wilmslow RoadAppliedReceived£31,000.00
Lakeshore Consulting Engineers · TorontoMy WeekPriya RamanSigned offPaid Hours38:30To Invoice$6,650.00
Kōwhai Digital · AucklandMilestonesDesign ApprovedCompletedPayments Due On It$24,000.00
Marlow & Finch · LisbonItems WaitingBooking flow: room pickerWritten DownRecorded1140,00 €To Bill855,00 €
Al Noor Interiors · DubaiChange OrdersTwo extra meeting podsExecutedPrice Change+AED 42,600.00
Barros Lima Advogados · São PauloRequired DocumentsComprovante de RendaAcceptedRequested FromFernanda Albuquerque
Okafor & Partners · LagosRetainersLekki Marine Services LtdNearly UsedLeft2 hAmount Left₦90,000
Mensah & Co. Chartered Accountants · AccraExpensesOsu Office SuppliesApprovedGoes ToBilled to the clientAmountGH₵842.00
Harcourt Lane Solicitors · ManchesterDepositsPurchase · 88 Wilmslow RoadAppliedReceived£31,000.00
Lakeshore Consulting Engineers · TorontoMy WeekPriya RamanSigned offPaid Hours38:30To Invoice$6,650.00
Kōwhai Digital · AucklandMilestonesDesign ApprovedCompletedPayments Due On It$24,000.00
Marlow & Finch · LisbonItems WaitingBooking flow: room pickerWritten DownRecorded1140,00 €To Bill855,00 €
Al Noor Interiors · DubaiChange OrdersTwo extra meeting podsExecutedPrice Change+AED 42,600.00
Barros Lima Advogados · São PauloRequired DocumentsComprovante de RendaAcceptedRequested FromFernanda Albuquerque
Okafor & Partners · LagosRetainersLekki Marine Services LtdNearly UsedLeft2 hAmount Left₦90,000
Mensah & Co. Chartered Accountants · AccraExpensesOsu Office SuppliesApprovedGoes ToBilled to the clientAmountGH₵842.00
Harcourt Lane Solicitors · ManchesterDepositsPurchase · 88 Wilmslow RoadAppliedReceived£31,000.00
Lakeshore Consulting Engineers · TorontoMy WeekPriya RamanSigned offPaid Hours38:30To Invoice$6,650.00
Kōwhai Digital · AucklandMilestonesDesign ApprovedCompletedPayments Due On It$24,000.00
Marlow & Finch · LisbonItems WaitingBooking flow: room pickerWritten DownRecorded1140,00 €To Bill855,00 €
Al Noor Interiors · DubaiChange OrdersTwo extra meeting podsExecutedPrice Change+AED 42,600.00
Barros Lima Advogados · São PauloRequired DocumentsComprovante de RendaAcceptedRequested FromFernanda Albuquerque
Okafor & Partners · LagosRetainersLekki Marine Services LtdNearly UsedLeft2 hAmount Left₦90,000
Mensah & Co. Chartered Accountants · AccraExpensesOsu Office SuppliesApprovedGoes ToBilled to the clientAmountGH₵842.00
Harcourt Lane Solicitors · ManchesterDepositsPurchase · 88 Wilmslow RoadAppliedReceived£31,000.00
Marlow & Finch · LisbonWebsite Rebuild · Atlântico HotelsIn progress◆◆◆Margin %42.4%To Invoice14 250,00 €
Estudio Calderón · BogotáCasa Patio · ChapineroIn progress◆◆◆Margin %36.1%To Invoice$ 48.600.000
Fitzgerald Heating & Electrical · CorkHeating Upgrade · Riverside Business CentreIn progress◆◆◆Margin %28.7%To Invoice€3,562.50
Lakeshore Consulting Engineers · TorontoBridge Rehabilitation · Don Valley ParkwayIn progress◆◆◆Margin %33.8%To Invoice$17,370.00
Barros Lima Advogados · São PauloCompra · Apartamento 142, Vila MarianaWaiting on the client◆◆◆Margin %51.2%To InvoiceR$ 18.400,00
Kōwhai Digital · AucklandBooking App · Waiheke FerriesDelayed◆◆◆Margin %31.5%To Invoice$32,000.00
Caribe Producciones · Santo DomingoCongreso Médico del CaribeIn progress◆◆◆Margin %22.9%To InvoiceRD$865,000.00
Tanaka Design Office · OsakaKyoto Machiya HotelIn progress◆◆◆Margin %38.4%To Invoice¥4,280,000
Lakeshore Consulting Engineers · TorontoMy WeekPriya RamanSigned offPaid Hours38:30To Invoice$6,650.00
Kōwhai Digital · AucklandMilestonesDesign ApprovedCompletedPayments Due On It$24,000.00
Marlow & Finch · LisbonItems WaitingBooking flow: room pickerWritten DownRecorded1140,00 €To Bill855,00 €
Al Noor Interiors · DubaiChange OrdersTwo extra meeting podsExecutedPrice Change+AED 42,600.00
Barros Lima Advogados · São PauloRequired DocumentsComprovante de RendaAcceptedRequested FromFernanda Albuquerque
Okafor & Partners · LagosRetainersLekki Marine Services LtdNearly UsedLeft2 hAmount Left₦90,000
Mensah & Co. Chartered Accountants · AccraExpensesOsu Office SuppliesApprovedGoes ToBilled to the clientAmountGH₵842.00
Harcourt Lane Solicitors · ManchesterDepositsPurchase · 88 Wilmslow RoadAppliedReceived£31,000.00
Calisto Velocity

From the hour worked to the invoice it goes on

Client work and internal work, for every business you work for, in each record’s own currency.

Time and Spend

Record time and spend where the work happens

Time is logged on a work order, a project’s task or no task, by the timer or after the fact, in the business you work for. A receipt photo becomes an expense, filed on your week’s report and paid back, billed to a client or kept as a cost.

Timer

Start it from Home, a project or a shortcut; one runs at a time and carries on across your devices.

velocity.calistoco.com/velocity/time

Time

Every hour logged on your projects, and the hours per person.

Export CSVLog TimeStart Timer
Timer Running01:12:40Checkout Redesign · Fjordline Ferries · Payment step prototypesStop
Today5.8
This Week29.5
Billable This Week (hrs)26.0
Uninvoiced (hrs)61.5
Running Timers2
EntriesBy Person
StartMemberProjectDuration (min)BillableStatusInvoiced
08:52Ingrid SolbergPayment step prototypesCheckout Redesign · Fjordline Ferries72YesRunningNo
09:10Magnus HaugenApp store release 4.2Member App · Trondheim Sports Club49YesRunningNo
07:45Sigrid BakkeAccessibility reviewCheckout Redesign · Fjordline Ferries105YesStoppedNo
13:00Ingrid SolbergSprint planningMember App · Trondheim Sports Club60NoStoppedNo
10:15Erik LundeRoom search filtersBooking Site · Lofoten Lodges150YesStoppedYes
08:30Magnus HaugenPush notification settingsMember App · Trondheim Sports Club150YesStoppedYes

My Week

Clock and work time in one week, typed into a cell or taken from your calendar.

velocity.calistoco.com/velocity/my-week

My Week

Ingrid Solberg

02.11.2026 to 08.11.2026 · Not submitted

Previous WeekNext WeekCopy Last WeekSubmit Week
WorkMon 2Tue 3Wed 4Thu 5Fri 6Total
Payment step prototypesCheckout Redesign · Fjordline Ferries3:304:002:003:001:3014:00
Accessibility reviewCheckout Redesign · Fjordline Ferries1:001:302:301:002:008:00
App store release 4.2Member App · Trondheim Sports Club2:001:001:302:302:309:30
Daily stand-upMember App · Trondheim Sports Club0:150:150:150:150:151:15
General time0:300:301:000:300:303:00
Clocked8:157:157:157:157:4537:45
Paid Hours8:007:007:007:007:3036:30

Logged 35:45 · billable 31:30 · clocked 37:45

From Your Calendar
Design critique with FjordlineThu 5 · 10:00–11:00Add to WeekNot Work

Time Entries

Every entry by person and project, billable or not, and the hours not yet invoiced, exported as CSV.

velocity.calistoco.com/velocity/time?lens=by-person

Time

Every hour logged on your projects, and the hours per person.

Export CSVLog TimeStart Timer
Today42.5
This Week238.0
Billable This Week (hrs)211.5
Uninvoiced (hrs)93.5
EntriesBy Person
PersonProjectHoursChargeableNon-ChargeableInvoicedEntries
AKAnanya KapoorTower B Facade · Lodha ParksideTower B Facade · Lodha Parkside46.5415.52832
RMRohan MehtaClinic Fit-Out · Bandra WestClinic Fit-Out · Bandra West5247.54.53640
PNPriya NairTower B Facade · Lodha ParksideTower B Facade · Lodha Parkside383622424
VSVikram ShettyHotel Lobby · Juhu Tara RoadHotel Lobby · Juhu Tara Road4438.55.530.528
NJNeha JoshiClinic Fit-Out · Bandra WestClinic Fit-Out · Bandra West35.5314.51820
ADArjun DesaiHotel Lobby · Juhu Tara RoadHotel Lobby · Juhu Tara Road4137422.530

Mileage

A claim by distance, in kilometers or miles, at each category’s rate.

velocity.calistoco.com/velocity/expenses?capture=mileage

Expenses

Expense reports, every expense with its receipt or distance, and what people are owed.

New ExpenseRecord Mileage
ReportsExpensesReimbursements
DateExpensePersonCategoryAmount
09/11/2026Site visit, Riverside Business Centre38 kmSeán MurphyMileage, Own Car€17.54
08/11/2026Skip hire for the bathroom strip-outPlant and HireAoife KellyPlant and Hire€240.00
07/11/2026Survey, 281 High Road24 kmSeán MurphyMileage, Own Car€11.08
06/11/2026Two double radiators and valvesMaterialsCiarán WalshMaterials€185.00
04/11/2026Boiler parts collection, Little Island17 kmCiarán WalshMileage, Own Car€7.85
Record Mileage
Mileage

€21.23 · 46 km

CancelSave Expense

Travel Requests

A trip asked for before it is booked, its expenses set against it.

velocity.calistoco.com/velocity/requests

Travel Requests

Asked before the trip: each request, its estimate and what was actually spent

Ask for a Purchase+ New Travel Request
Waiting for a Decision2
Approved3
Over Estimate1
RequestPersonDatesDestinationEstimateSpentStatus
Client workshop, Grupo AltamiraMonterreyVOValeria Ochoa22/11–24/11Monterrey$28,400$6,120Approved
Supply chain review, Planta BajíoLeónDRDiego Ramírez15/11–18/11León$36,900$18,250Approved
Board presentation, Fondo PacíficoGuadalajaraVOValeria Ochoa12/11–13/11Guadalajara$21,500$9,800Approved
Industry conference and trainingBogotáLHLucía Herrera01/11–03/11Bogotá$54,200$51,870Closed
Site assessment, Hoteles RivieraCancúnACAndrés Castillo25/10–27/10Cancún$32,600$35,940Closed
Due diligence visit, Agro NorteHermosilloDRDiego Ramírez17/10–19/10Hermosillo$26,100$24,380Closed

Per Diem

The days away at the day’s rate, claimed from an approved travel request.

velocity.calistoco.com/velocity/requests/tr-2214
Back to Requests

Client workshops, Nordkap Logistics Approved

Travel · Elin Bergström · 2026-11-06 – 2026-11-10 · Tromsø · Norway

Per Diem
5 × 640 kr = 3 200 krClaim Per Diem
Expenses Against It
06/11 · Flight to Tromsø3 420 krApproved
06/11 · Hotel, four nights7 360 krApproved
07/11 · Taxi to the client285 krApproved
08/11 · Workshop room1 180 krSubmitted
10/11 · Flight home2 960 krSubmitted
Estimate and Spent
Estimate
18 500 kr
Spent
15 205 kr
Against the Estimate
+3 295 kr

Ask for a Purchase, With Ledger

A purchase asked as a draft purchase order, on the purchase order’s own approval.

velocity.calistoco.com/velocity/requests?new=purchase

Travel Requests

Asked before the trip: each request, its estimate and what was actually spent

Ask for a Purchase+ New Travel Request
Waiting for a Decision3
Approved6
Over Estimate1
Ask for a Purchase
TravelPurchase
Items
ItemQuantityUnit cost
LED panel, 1x1, bi-colour4RM 1,450.00
Light stand, air-cushioned4RM 220.00
Softbox, 90 cm octagonal2RM 380.00
V-mount battery, 150 Wh4RM 540.00
Grip clamps, set of six1RM 160.00
Total15RM 9,760.00
Save as DraftSend for Approval

Receipt Capture, With Ledger

A receipt photo is read for its vendor, amount and date, the same capture as in Ledger and Today.

velocity.calistoco.com/velocity/expenses?capture=receipt

Expenses

Expense reports, every expense with its receipt or distance, and what people are owed.

New ExpenseRecord Mileage
Osu Office SuppliesOxford Street, Osu, Accra09/11/2026 · 10:42
A4 copier paper, 5 reamsGH₵212.00Lever-arch files, 10GH₵145.00Toner cartridge, blackGH₵389.00Envelopes, DL, 500GH₵96.00
TOTALGH₵842.00VAT incl. · Card ****4417
Upload the receipt, or drop it hereVendor, amount and date are read for you
Billed to the clientKept as our cost
Enter by HandSave Expense

Expense Reports

A person’s week of expenses with their receipts, approved or sent back, each one paid back, billed to a client or kept as a cost.

velocity.calistoco.com/velocity/expenses/reports/er-0418
Back to Expenses

Expense Report Submitted

Camila Paredes · 30/10/2026 – 05/11/2026

Send BackApprove
DateExpenseAmountReceiptBillablePaid BackStatus
30/10Flight, Lima to Cusco30/10S/ 612.00ViewOn the Pay ReportApproved
30/10Hotel, three nights, Plaza de Armas30/10S/ 885.00ViewOn the Pay ReportApproved
31/10Venue deposit, Casona San Blas31/10S/ 450.00ViewPaid by the businessApproved
1/11Taxi to the venue with the screens1/11S/ 48.00ViewOn the Pay ReportSubmitted
2/11Dinner with the client team2/11S/ 236.00ViewPaid DirectlySubmitted
4/11Printing, launch banners4/11S/ 174.00ViewOn the Pay ReportSubmitted
Comes To
S/ 2,405.00
Spent Against Requests
Travel · Product launch, CuscoEstimate S/ 2,400 · S/ 2,185.00
I Checked the VAT · Approve
velocity.calistoco.com/velocity/time

Time

Every hour logged on your projects, and the hours per person.

Export CSVLog TimeStart Timer
Timer Running01:12:40Checkout Redesign · Fjordline Ferries · Payment step prototypesStop
Today5.8
This Week29.5
Billable This Week (hrs)26.0
Uninvoiced (hrs)61.5
Running Timers2
EntriesBy Person
StartMemberProjectDuration (min)BillableStatusInvoiced
08:52Ingrid SolbergPayment step prototypesCheckout Redesign · Fjordline Ferries72YesRunningNo
09:10Magnus HaugenApp store release 4.2Member App · Trondheim Sports Club49YesRunningNo
07:45Sigrid BakkeAccessibility reviewCheckout Redesign · Fjordline Ferries105YesStoppedNo
13:00Ingrid SolbergSprint planningMember App · Trondheim Sports Club60NoStoppedNo
10:15Erik LundeRoom search filtersBooking Site · Lofoten Lodges150YesStoppedYes
08:30Magnus HaugenPush notification settingsMember App · Trondheim Sports Club150YesStoppedYes
Review

Decide each week, expense and request in one place

The review desk holds what waits on you: the person-weeks to sign off, expense reports, travel requests, write-downs and contractor statements, each with its context beside it. A week signed off is locked. The items are the same ones in the Approvals panel of your menu.

velocity.calistoco.com/velocity/review

Review

What waits on you, with its context beside it

Hours5Expenses4Requests2Pre-Bill3Reimbursements2Statements1
TNThandi Nkosi02/11 to 08/11
PvPieter van Wyk02/11 to 08/11
APAyesha Patel02/11 to 08/11
LBLiam Botha02/11 to 08/11
NMNaledi Mokoena02/11 to 08/11
Thandi Nkosi · 02/11 to 08/11Level 1 of 2
This week: Logged 37:45 · billable 36:00 · clocked 40:15 · paid 40:00
WorkBillableRateOn the Invoice
Logo system and lockupsBrand Refresh · Table Mountain Aerial Cableway14:30R 950,00R 13 775,00
Signage familyBrand Refresh · Table Mountain Aerial Cableway9:00R 950,00R 8 550,00
Bottle label artworkPackaging · Fynbos Gin Company8:30R 875,00R 7 437,50
Print proofs with the printerPackaging · Fynbos Gin Company4:00R 875,00R 3 500,00
Directional sign drawingsWayfinding · V&A Waterfront3:30R 900,00R 3 150,00
ApproveRejectRequest ChangesDelegate

Your Own Routing

velocity.calistoco.com/velocity/settings/approvals

Approvals

Who approves each kind of item, in what order, and above which amount. Decisions are made in Approvals and on each item.

LevelApplies to items aboveApproved byWhen several people are asked
Level 1Every item, whatever its amount.Lea Brunner, Marco KellerThe people I nameThe first to answer decides
Level 2CHF 5'000The adminsA roleOne approval is enough
Level 3CHF 25'000The ownerA roleEveryone approves
Add a LevelSave

Approvers by person, money group or role, in order and levels, with thresholds per currency.

While You Are Away

velocity.calistoco.com/velocity/review

Review

What waits on you, with its context beside it

ADWeek of Can ÖztürkKadıköy Metro Station · Structural Survey · For Ayşe Demir, while they are awayHours
ADExpense report, Deniz AksoySite visits, Bursa · For Ayşe Demir, while they are awayExpenses
ADTravel request, Mert YılmazClient meeting, Ankara · For Ayşe Demir, while they are awayRequests
ADWrite-down, facade calculationsGalata Hotel Extension · For Ayşe Demir, while they are awayPre-Bill
ADStatement ST-0412, Anadolu İskele Ltd.Scaffolding, March · For Ayşe Demir, while they are awayStatements
While You Are Away
Choose someone who decides your approvals for a while. What waits on you appears in their Approvals too, and their decision is recorded as made for you.
Emre Kaya · Everything · 07/11 to 21/11End Now

Someone decides your approvals while you are away, and an item nobody answers goes to someone else after a while.

Reminders, With Automations

automations.calistoco.com/rules

Automations

Tell a person their timer is still runningSet up by Velocity. When someone’s timer is still running at the end of the day it started on, or ten hours after it started, whichever comes first, they hear it on their phone and in the app, with Stop Timer.
Remind a person to hand in their weekSet up by Velocity. At 5 pm on the last day of your week, everyone with time that week who has not handed it in hears it on their phone and in the app, with Submit Week.

Timer Still Running and Week Not Submitted, each a rule you can turn off.

A Week Signed Off

velocity.calistoco.com/velocity/my-week

My Week

Marcus Reyes

11/09/2026 to 11/15/2026 · Sent back for changes

Submit Week
Sent back: Move Thursday’s framing hours to the Lakeway kitchen, not the Barton Hills deck.
WorkMon 9Tue 10Wed 11Thu 12Fri 13Total
Framing, second floorKitchen Remodel · Lakeway6:005:307:004:006:0028:30
Deck framing and joistsDeck Build · Barton Hills2:002:301:004:002:0011:30
Material pickupKitchen Remodel · Lakeway0:300:300:300:300:302:30
Earlier Weeks
WeekStatus
11/02 to 11/08Signed offLocked
10/26 to 11/01Signed offLocked
10/19 to 10/25Signed offLocked

Locked once approved; sent back, it opens again with the reviewer’s note.

Paid Back, With Workforce

velocity.calistoco.com/velocity/expenses/reimbursements

Expenses

Expense reports, every expense with its receipt or distance, and what people are owed.

ReportsExpensesReimbursements
PersonOwedExpensesPaidStatus
WKWanjiru KamauKsh 18,450.004On the Pay ReportNext Pay Report
OOOtieno OdhiamboKsh 7,200.002On the Pay ReportNext Pay Report
AHAmina HassanKsh 31,900.006Paid DirectlyTo Pay
BMBrian MwangiKsh 4,350.001On the Pay ReportNext Pay Report
GAGrace AchiengKsh 12,780.003Paid DirectlyPayable Written

A line on the pay report your payroll takes, or a payable through Ledger.

Contractor Statements

velocity.calistoco.com/velocity/review?tab=statements
Hours3Expenses2Requests1Pre-Bill2Reimbursements1Statements1
ST-2031 · Southbank Irrigation Pty LtdPay agreements: Irrigation Install, Call-Out
Drip irrigation, front garden
$2,840.00
Controller and rain sensor
$1,260.00
Call-out, valve fault
$760.00
Pop-up sprinklers, back lawn
$1,940.00
Backflow valve test and certificate
$380.00
Owed $7,180.00 · deducted $359.00 · to pay $6,821.00
ApproveRejectRequest Changes

Signed off, then posted as the statement’s own payable in Ledger.

Projects

Run each project in phases, on one page

A project is client work or internal work, opened by hand, from a won deal or a contract, or for a record such as a development or a location. Its page opens on where it stands, the next milestone and its margin.

All Projects

Every project with its hours, what is to invoice, its profit and margin, by status, owner, type or client.

velocity.calistoco.com/velocity/projects

Projects

Every project: its hours, its costs, what it has billed and what it earned

New Project
All ProjectsBy StatusBy OwnerBy TypeBy Client
In Progress9
With Work to Invoice6
Hours Logged1,284
Closed14
ProjectClientHoursTo InvoiceProfitMargin %Status
Brand RefreshTMC-03 · Table Mountain Aerial CablewayTable Mountain Aerial Cableway386.5R 48 750R 212 00068.4%In progress
PackagingFGC-11 · Fynbos Gin CompanyFynbos Gin Company142R 21 400R 96 00061.2%In progress
WayfindingVAW-07 · V&A WaterfrontV&A Waterfront251.5R 33 600R 140 00057.9%In progress
Annual ReportSAN-26 · Sanlam FoundationSanlam Foundation88R 12 200R 72 00052.3%Waiting on the client
Menu and SignageBWB-02 · Bree Street Wine BarBree Street Wine Bar61.5R 8 150R 38 00034.6%In progress
WebsiteKRB-05 · Kirstenbosch Botanical SocietyKirstenbosch Botanical Society102R 6 400R 124 00063.8%Completed

Timeline

A Gantt of tasks and milestones; a move with dependents lists each new date for you to decide.

velocity.calistoco.com/velocity/projects/cp-11/timeline

Casa Patio · Chapinero In progress

CP-11 · Familia Restrepo Gómez

Start TimerLog TimeInvoice…
OverviewTimelineMilestonesTasksKey Dates & ConditionsPartiesDocumentsUpdatesChange OrdersBudgetTime & CostsBillingSite Controls
ScaleDayWeekMonthEarlierTodayLater
Plan20/1027/103/1110/1117/1124/111/128/1215/12
Concept Design
Concept Approved by the Client◆
Developed Design
Structural Coordination
Planning Submission◆
Interior Design
Construction Drawings
Tender Issued◆
This Move Has Dependents

Developed Design moves to 03/11/2026 – 01/12/2026. What waits on it would move too:

Planning Submission
27/11/2026 → 04/12/2026
Construction Drawings
27/11/2026 → 04/12/2026
Tender Issued
15/12/2026 → 22/12/2026
CancelJust This OneMove All

Milestones

Payments fall due as a milestone is reached, or once the client approves it.

velocity.calistoco.com/velocity/projects/wf-08/milestones

Booking App · Waiheke Ferries In progress

WF-08 · Waiheke Ferries Ltd

Apply a Milestone Plan…Add Milestone
OverviewTimelineMilestonesTasksKey Dates & ConditionsPartiesDocumentsUpdatesChange OrdersBudgetTime & CostsBillingSite Controls
MilestoneTargetResponsibleProgress %StatusPayments Due On It
Discovery Signed Off23/09/2026Aroha Ngata100%Completed$18,000.00
Design Approved21/10/2026Liam Te Rangi100%Completed$24,000.00
Beta in Testers’ Hands16/11/2026Mia Thompson70%In progress$32,000.00
Payments Live in the App26/11/2026Jack Wilson35%Delayed$16,000.00
Store Listing Approved07/12/2026Mia Thompson20%In progress$8,000.00
Store Launch14/12/2026Aroha Ngata10%Not started$22,000.00
Client Sign-Off and Handover21/12/2026Aroha Ngata5%Not started$12,000.00

What If It Slips

The milestones and payments a delay would move, across projects, moving nothing.

velocity.calistoco.com/velocity/projects/twr-3/milestones

Water Reclamation · Tuas Plant In progress

TWR-3 · Tuas Utilities Pte Ltd

Start TimerLog TimeInvoice…
OverviewTimelineMilestonesTasksKey Dates & ConditionsPartiesDocumentsUpdatesChange OrdersBudgetTime & CostsBillingSite Controls
MilestoneTargetStatusPayments Due On It
Mechanical Installation Complete07/11/2026Delayed$240,000.00
Pump Station Commissioned22/11/2026In progress$186,000.00
Control Room Handover10/12/2026Not started$94,000.00
Performance Test Passed24/12/2026Not started$120,000.00
Final Acceptance09/01/2027Not started$150,000.00
What If It Slips

See what a delay would move: the milestones waiting on it and the payments due on them. Nothing changes.

A slip of 14 days moves 3 milestones waiting on it and 3 payments due on them, 1 past a guarantee. Nothing has changed: move each one yourself.

MilestoneTargetPayments Due On It
Pump Station CommissionedWater Reclamation · Tuas Plant22/11/2026 → 06/12/2026$186,000.00
Control Room HandoverWater Reclamation · Tuas Plant10/12/2026 → 24/12/2026$94,000.00
Integrated Systems TestData Hall B · Jurong Campus21/12/2026 → 04/01/2027$68,000.00
Show

Tasks

Each charged by the hour, at a fixed amount or not at all, its estimate beside the hours logged.

velocity.calistoco.com/velocity/projects/dvp-14/tasks

Bridge Rehabilitation · Don Valley Parkway In progress

DVP-14 · City of Toronto

Add Task
OverviewTimelineMilestonesTasksKey Dates & ConditionsPartiesDocumentsUpdatesChange OrdersBudgetTime & CostsBillingSite Controls
TaskChargesOwn RateEst. hrsLogged hrsTo InvoiceAssignee
Bearing inspection, north abutmentOwen ParkTime: per hour$180 / h2422.5$1,350.00Owen Park
Load rating modelHannah ClarkeTime: per hour$180 / h4036$1,980.00Hannah Clarke
Deck condition surveyOwen ParkTime: per hour$165 / h3230.5$1,485.00Owen Park
Traffic management planMaya SinghFixed amount$4,8001816$4,800.00Maya Singh
Rehabilitation drawings, phase 1Daniel FortinTime: per hour$165 / h6041.5$2,310.00Daniel Fortin
Weekly coordination with the CityHannah ClarkeNon-chargeableNon-chargeable129.5Non-chargeableHannah Clarke

Projects Inside Projects

A building with a project per unit, each with its own client and schedule.

velocity.calistoco.com/velocity/projects/ea-1240/milestones

Edificio Alameda 1240 In progress

EA-1240 · Inmobiliaria Alameda

Inside a Project…New Project Inside
OverviewTimelineMilestonesTasksKey Dates & ConditionsPartiesDocumentsUpdatesChange OrdersBudgetTime & CostsBillingSite Controls
Projects Inside
ProjectClientStatusDeadlineTo InvoiceInvoiced
Depto 101Camila FuentesCamila FuentesCompleted29-10-2026$7.425.000$148.500.000
Depto 204Matías Rojas VidalMatías Rojas VidalIn progress28-11-2026$24.750.000$99.000.000
Depto 305Valentina SotoValentina SotoIn progress13-12-2026$31.200.000$87.600.000
Depto 402Sebastián MuñozSebastián MuñozIn progress27-12-2026$18.900.000$62.300.000
Depto 503Isidora PérezIsidora PérezIn progress10-01-2027$12.400.000$41.800.000
Depto 604Tomás RiquelmeTomás RiquelmeIn progress17-01-2027$15.800.000$36.500.000
Local Comercial 1Café Altamira SpACafé Altamira SpAIn progress24-01-2027$9.600.000$28.900.000

Client Updates, With Navigator

Updates with progress photos, shared tasks and milestones to approve in their portal.

velocity.calistoco.com/velocity/projects/tor-4/updates

Garden Rebuild · 14 Toorak Road In progress

TOR-4 · Hannah and James Whitfield

Post Update…
OverviewTimelineMilestonesTasksKey Dates & ConditionsPartiesDocumentsUpdatesChange OrdersBudgetTime & CostsBillingSite Controls
DayUpdatePhotosClient
09/11Turf laid on the back lawn; the irrigation runs on its timer from tonight.6Shared
06/11Sandstone steps set and the retaining wall capped.4Shared
02/11Native planting along the fence line: 40 grevilleas and kangaroo paw.8Shared
29/10Drainage under the terrace re-routed after the rain; no change to the date.3Kept Back
26/10Deck framing up; the spotted gum boards arrive Monday.5Shared
22/10Old pavers lifted and the side path levelled for the new gravel.4Shared

From a Won Deal, With Deals

The deal’s tasks become the project’s first tasks, one project per deal.

velocity.calistoco.com/velocity/projects/new?dealId=bcr-spring

New Project

Plan the work, track its time and costs, and bill it when it is for a client

CancelOpen Project
Add the agreed lines as tasksCampaign strategy and media planThree creative routesSocial content, twelve weeksPaid media managementMonthly results report

Files, With Depot

The project’s files, and a photo or PDF shared from a phone straight onto it.

velocity.calistoco.com/velocity/projects/ssd-09/documents

Café Fit-Out · Seongsu-dong In progress

SSD-09 · Onion Coffee Co., Ltd.

Start TimerLog TimeInvoice…
OverviewTimelineMilestonesTasksKey Dates & ConditionsPartiesDocumentsUpdatesChange OrdersBudgetTime & CostsBillingSite Controls
Required DocumentsSignaturesFiles
NameKindAdded
Floor plan, revision CDocument2026. 11. 09.
Counter and shelving elevationsDesign2026. 11. 08.
Rear wall before demolitionFile2026. 11. 08.
Lighting scheduleDocument2026. 11. 06.
Approved tile and timber samplesFile2026. 11. 05.
Walkthrough of the finished shopfrontVideo2026. 11. 04.
Fire permit applicationDocument2026. 11. 02.
velocity.calistoco.com/velocity/projects

Projects

Every project: its hours, its costs, what it has billed and what it earned

New Project
All ProjectsBy StatusBy OwnerBy TypeBy Client
In Progress9
With Work to Invoice6
Hours Logged1,284
Closed14
ProjectClientHoursTo InvoiceProfitMargin %Status
Brand RefreshTMC-03 · Table Mountain Aerial CablewayTable Mountain Aerial Cableway386.5R 48 750R 212 00068.4%In progress
PackagingFGC-11 · Fynbos Gin CompanyFynbos Gin Company142R 21 400R 96 00061.2%In progress
WayfindingVAW-07 · V&A WaterfrontV&A Waterfront251.5R 33 600R 140 00057.9%In progress
Annual ReportSAN-26 · Sanlam FoundationSanlam Foundation88R 12 200R 72 00052.3%Waiting on the client
Menu and SignageBWB-02 · Bree Street Wine BarBree Street Wine Bar61.5R 8 150R 38 00034.6%In progress
WebsiteKRB-05 · Kirstenbosch Botanical SocietyKirstenbosch Botanical Society102R 6 400R 124 00063.8%Completed
Site and Subcontractors

Keep each project’s site records and subcontracts

The Daily Log is the day’s diary, with an order book where your country keeps one. Questions go out as numbered requests for information, sign-offs and the handover close the work, and Delivery shows each board across every project.

velocity.calistoco.com/velocity/delivery/daily-log

Daily Log

Each day of the work, the instructions given on site and the incidents.

Add Photos…New Entry
Entries6
Orders Issued1
Awaiting Signature1
Hours Lost3
All EntriesAwaiting Signature
DateBookKindProjectEntryCrewWeather
30/10/2026Order BookOrderHeating Upgrade · Riverside Business CentreThe two meeting-room radiators move to the new partition positions, as confirmed in RFI 3.Awaiting Signature2Dry
30/10/2026DiaryDaily entryRewire and New Consumer Unit · 281 High RoadFirst fix finished in every room; the plasterer can start on Monday.2Dry
30/10/2026DiaryDaily entryHeating Upgrade · Riverside Business CentreThe client asked to keep the meeting room warm until Friday; its radiator stays on until then.2Showers
29/10/2026DiaryDaily entryHeating Upgrade · Riverside Business CentreGround floor started: reception and the two offices cleared for us.3Rain all day
24/10/2026DiaryDaily entryHeating Upgrade · Riverside Business CentreFirst floor finished: the system filled and tested with no leaks.3Dry and cold
24/10/2026IncidentsIncidentHeating Upgrade · Riverside Business CentreThe second boiler was held at the merchant; the crew moved to first-floor snagging, three hours lost.3Dry and cold

Requests for Information

Numbered questions with a due day, what each holds up and what it does to the schedule or cost.

velocity.calistoco.com/velocity/delivery/rfis

Requests for Information

Questions with an owner, a deadline and the work they hold up.

New Request
Open3
Overdue1
Moving the Schedule2
Waiting on You1
#QuestionDueHolds UpScheduleCostStatus
7Can the plant room door open outwards for the second boiler?Milestone · Plant Room Ready08/11/2026MilestonePlant Room ReadyYesYesOpen
6Which wall takes the new consumer unit in the kitchen?Work order · WO-2291 · 14 Maple Grove13/11/2026Work orderWO-2291 · 14 Maple GroveNoNoOpen
5Are the existing radiator valves kept on the first floor?Subcontract · Pipe insulation, plant room15/11/2026SubcontractPipe insulation, plant roomNoYesOpen
4Flue route through the east elevation: is scaffold access confirmed?Subcontract · Scaffold, east elevation01/11/2026SubcontractScaffold, east elevationYesNoAnswered
3Meeting-room radiators: old or new partition positions?Milestone · First Fix Complete27/10/2026MilestoneFirst Fix CompleteYesYesClosed
2Is the client supplying the smart thermostats?Work order · WO-2240 · Riverside Business Centre20/10/2026Work orderWO-2240 · Riverside Business CentreNoYesClosed
Contracts

Work a contract’s steps on the project that delivers it

A contract’s steps, conditions, parties, documents, signatures and deposits sit on its project. A coordinator works every contract from My Steps, Deadlines, At Risk and Documents In, each row opening its project.

Every contract you coordinate, step by step.

My Steps

Every step due on you across your contracts, with each one’s Completion Date.

velocity.calistoco.com/velocity/contracts/my-steps

My Steps

The Contract steps you hold, the soonest first.

Open Steps9
Past Their Day1
StepContractSideDueCompletion Date
Searches back from the councilPurchase · 12 Didsbury ParkPurchase · 12 Didsbury ParkBuyer Side09/11/202614/12/2026
Mortgage offer receivedPurchase · Flat 4, Ancoats MillPurchase · Flat 4, Ancoats MillBuyer Side12/11/202607/12/2026
Replies to enquiries sentSale and Purchase · 3 Chorlton GreenSale and Purchase · 3 Chorlton GreenBoth Sides13/11/202621/12/2026
Lease engrossed for signatureLease · Unit 7, Trafford ParkLease · Unit 7, Trafford ParkSeller Side15/11/202629/11/2026
Exchange of contractsPurchase · 12 Didsbury ParkPurchase · 12 Didsbury ParkBuyer Side19/11/202614/12/2026
Completion statement to the clientSale and Purchase · 3 Chorlton GreenSale and Purchase · 3 Chorlton GreenBoth Sides22/11/202621/12/2026

Deadlines

Each contract’s next deadline and how many steps are late.

velocity.calistoco.com/velocity/contracts/deadlines

Deadlines

Every open Contract against its next deadline, a late step first.

Open7
Deadlines Overdue2
Completing This Month3
ContractStepNext DeadlineLate StepsCompletion DateDeadlines
Sale · 12 Kifisias Avenue, MarousiSeller SideTax clearance certificate08/11/2026228/11/2026Action required
Purchase · Apartment 4B, KolonakiBuyer SideNotary deed drafted09/11/2026122/11/2026Action required
Lease · Shop 3, Ermou StreetBoth SidesLease signed14/11/2026None19/11/2026On track
Purchase · Villa, VouliagmeniBuyer SideEngineer’s certificate16/11/2026None07/12/2026On track
Sale · Office floor, Syngrou AvenueSeller SideBuyer’s deposit received18/11/2026None13/12/2026On track
Purchase · Maisonette, GlyfadaBuyer SideLand registry search21/11/2026None25/12/2026On track

At Risk

The step at risk, what is not covered and who holds it.

velocity.calistoco.com/velocity/contracts/at-risk

At Risk

Open Contracts with a late step, a deadline days away, no financing approval near completion, or a screening to review

Contracts at Risk5
Steps Overdue2
Financing Not Approved1
ContractRiskStepDueHeld By
Compra · Apartamento 142, Vila MarianaBuyer SideFinancing Not ApprovedAprovação do financiamento16/11/2026Banco do Brasil
Venda · Casa, Alto de PinheirosSeller SideStep OverdueCertidões negativas entregues07/11/2026Construtora Vila Mariana Ltda
Compra · Sala Comercial, Faria LimaBuyer SideDeadline SoonEscritura assinada12/11/2026Cartório do 15º Tabelião
Locação · Loja 8, Oscar FreireBoth SidesDeposits Over CoverCaução recebida14/11/2026Imobiliária Jardins
Compra · Cobertura, MoemaBuyer SideCover Ends Before CompletionSeguro fiança renovado19/11/2026Porto Seguro

Third-Party Coordinators

The contracts an outside coordinator works for you, beside your own.

velocity.calistoco.com/velocity/contracts/third-party

Third-Party Coordinators

Contracts5
Coordinators3
CoordinatorContractSideDoneCompletion Date
LOLucía OrtegaCompraventa · Calle Velázquez 64Buyer Side75%22/11/2026
LOLucía OrtegaCompraventa · Paseo de la Habana 9Seller Side40%06/12/2026
JMJavier MontesArrendamiento · Local en ChamberíBoth Sides90%15/11/2026
JMJavier MontesCompraventa · Ático en SalamancaBuyer Side55%29/11/2026
MIMarta IbáñezCompraventa · Chalet en PozueloSeller Side25%18/12/2026
Billing

Review the work before it goes on an invoice

To Invoice lists every hour, fixed task and chargeable cost not yet billed, project by project. Write an item up or down or defer it, with the original kept, then invoice it with the time report attached. The invoice is Ledger’s.

velocity.calistoco.com/velocity/billing

To Invoice

Work and costs waiting to be invoiced, Project by Project

New Invoice
Projects to Invoice5
Hours to Invoice273
Hours With No Rate4
ProjectClientHoursTo Invoice
Bridge Rehabilitation · Don Valley ParkwayCity of Toronto96.5$17,370.00
Transit Hub Structural ReviewMetrolinx64$12,160.00
Warehouse Retrofit · MississaugaPeel Cold Storage Inc.48.5$8,730.00
Condo Tower Peer ReviewHarbourfront Developments38$7,220.00
Seismic Assessment · St. Michael’s WingUnity Health Toronto26$5,070.00
Items Waiting
ItemDayHoursRecordedTo BillDecision
Load rating modelBridge Rehabilitation · Don Valley Parkway11-0511$1,980.00$1,485.00Written DownWaiting for Approval
Site walk with the contractorTransit Hub Structural Review11-064$760.00$950.00Written Up
Roof truss calculationsWarehouse Retrofit · Mississauga11-079.5$1,710.00$1,710.00Billed Later
Comments on the podium transfer slabCondo Tower Peer Review11-086$1,140.00$912.00Written Down
Anchor pull-out testsSeismic Assessment · St. Michael’s Wing11-095$950.00$1,045.00Written Up
velocity.calistoco.com/velocity/billing?adjust=1

To Invoice

Work and costs waiting to be invoiced, Project by Project

New Invoice
Items Waiting
ItemDayHoursRecorded
Booking flow: room pickerWebsite Rebuild · Atlântico Hotels07/11121140,00 €
Room photography editWebsite Rebuild · Atlântico Hotels07/116.5617,50 €
Wine club sign-up flowBrand Site · Quinta do Vale Wines08/118760,00 €
Content entry, tasting notesBrand Site · Quinta do Vale Wines08/115475,00 €
Staff directory searchIntranet · Porto Port Authority09/119855,00 €
Before It Is Billed

The original is kept. A write-down above your share waits for approval in Approvals.

Booking flow: room picker · 1140,00 €

Write DownWrite UpBill LaterDo Not Bill
CancelSave

Change what an item bills, with what was recorded kept beside it.

One invoice for one client’s projects in one currency, the hours grouped by project, task or person.

Hours or an amount each week or month, or a prepaid balance, for a client, a project or a maintenance contract.

What an hour is sold as, by person, project or task, from the price engine.

A success fee, a capped fee, or the bills split between payers.

What the client bought, drawn down as the work delivers it.

Capacity and Reports

See who is free and what each project earns

Capacity sets each person’s planned hours against what their shifts let them work, week by week. Reports cost every hour by the same rule as Workforce’s pay report: profitability, utilization, cost against output, hire against freelance, budget burn and project margin, per currency.

velocity.calistoco.com/velocity/capacity

Capacity

What each person can work, what they are allocated, and the time they handed in.

General timeAdd Project
EarlierThis WeekLaterAvailable 816 h · Planned 681 h · Actual 131 h
Person09/1116/1123/1130/11Total
ICInês CarvalhoDesign Lead34 / 3633 / 3630 / 3622 / 36119 h
TMTiago MendesDeveloper36 / 4044 / 4036 / 4032 / 40148 h
BCBeatriz CostaDeveloper24 / 2420 / 2418 / 2412 / 2474 h
RFRui FernandesContent30 / 3228 / 3216 / 1626 / 32100 h
SASofia AlmeidaProject Manager26 / 3624 / 3628 / 3620 / 3698 h
DPDuarte PiresDeveloper32 / 4036 / 4040 / 4034 / 40142 h
Planned past their hoursTiago Mendes · 16/11

Profitability and Margin

What each project and client earns against the cost of every hour, per currency.

velocity.calistoco.com/velocity/reports/profitability

Reports

What the work earned and cost, and how the team’s hours were used, per currency.

ProfitabilityUtilizationCost vs OutputHire vs FreelanceBudget BurnOriginationRealizationProject MarginOverdue & At RiskUpcoming Deadlines
01/10/202631/10/2026By ClientExport CSV
NameHoursBillable HoursBilledCostProfitMargin %
Grupo Altamira412386$1,544,000$861,000$683,00044%
Planta Bajío296274$1,096,000$642,500$453,50041%
Fondo Pacífico188181$814,500$401,200$413,30051%
Hoteles Riviera164139$556,000$398,700$157,30028%
Agro Norte121112$448,000$289,400$158,60035%
Cervecería del Valle8671$284,000$231,900$52,10018%

Utilization

Each person’s billable share of the hours they worked.

velocity.calistoco.com/velocity/reports/utilization

Reports

What the work earned and cost, and how the team’s hours were used, per currency.

ProfitabilityUtilizationCost vs OutputHire vs FreelanceBudget BurnOriginationRealizationProject MarginOverdue & At RiskUpcoming Deadlines
01/10/202631/10/2026By PersonExport CSV
PersonAvailableWorkedBillableBillable %Utilization %Revenue
WLWei Ling Tan15214813189%86%$27,510
APArjun Pillai15215613888%91%$26,910
SRSiti Rahman1201169279%77%$16,560
MLMarcus Lim15214010172%66%$18,180
HGHannah Goh15215012885%84%$21,120
DODaniel Ong76746182%80%$10,065

Budget Burn

How fast each budget is being used against the time gone.

velocity.calistoco.com/velocity/reports/budget-burn

Reports

What the work earned and cost, and how the team’s hours were used, per currency.

ProfitabilityUtilizationCost vs OutputHire vs FreelanceBudget BurnOriginationRealizationProject MarginOverdue & At RiskUpcoming Deadlines
01/10/202631/10/2026By ClientExport CSV
ProjectBudget AmountUsedLeftUsed %
Garden Rebuild · 14 Toorak Road$64,000$47,800$16,20075%
Rooftop Terrace · Collins Street$92,000$51,500$40,50056%
Courtyard · Fitzroy Townhouses$38,000$37,200$80098%
Native Garden · Eltham Primary School$27,500$12,400$15,10045%
Pool Surrounds · Brighton$71,000$60,300$10,70085%
Streetscape · Camberwell Junction$118,000$41,200$76,80035%

Origination and Realization

Who brought in what was billed, and how much of the time worked was paid.

velocity.calistoco.com/velocity/reports/origination

Reports

What the work earned and cost, and how the team’s hours were used, per currency.

ProfitabilityUtilizationCost vs OutputHire vs FreelanceBudget BurnOriginationRealizationProject MarginOverdue & At RiskUpcoming Deadlines
01/10/202631/10/2026By PersonExport CSV
PersonProjectsOriginating CreditBilled on Their Projects
Carolina Ruiz14$ 38.400.000$ 41.200.000
Martín Acosta11$ 26.900.000$ 29.750.000
Florencia Paz9$ 18.650.000$ 21.300.000
Gonzalo Ferreyra7$ 12.100.000$ 13.800.000
Julieta Benítez5$ 7.450.000$ 8.900.000
Realization
ProjectWorked ValueBilled ValueBilling Realization %Collection Realization %
Molinos del Sur S.A.$ 9.800.000$ 9.310.00095%92%
Bodega Los Andes$ 7.600.000$ 6.840.00090%88%
Grupo Tandil$ 5.400.000$ 5.400.000100%97%
Clínica Belgrano$ 4.100.000$ 3.690.00090%90%
Pampa Energía Verde$ 3.900.000$ 3.280.00084%75%

Overdue and Upcoming

Late milestones and tasks, and the deadlines of the next 30, 60 or 90 days.

velocity.calistoco.com/velocity/reports/overdue

Reports

ProfitabilityUtilizationCost vs OutputHire vs FreelanceBudget BurnOriginationRealizationProject MarginOverdue & At RiskUpcoming Deadlines
WhatNameProjectDueDays Late
MilestoneFacade Samples ApprovedUmeda Office Tower Lobby2026/11/046
TaskLighting plan, level 3Kyoto Machiya Hotel2026/11/064
Contract StepFire Safety Sign-OffKobe Harbour Café2026/11/082
Document DueStructural SurveyNamba Clinic Fit-Out2026/11/091
TaskSignage artwork to the printerUmeda Office Tower Lobby2026/11/091
Upcoming DeadlinesNext 30 Days
DateIn DaysWhatNameProject
2026/11/133MilestoneConcept PresentationNara Ryokan Renewal
2026/11/188TaskDoor schedule issuedNamba Clinic Fit-Out
2026/11/2212MilestoneTender Package IssuedKyoto Machiya Hotel
2026/11/2919Contract StepHandover InspectionKobe Harbour Café
2026/12/0626MilestoneFurniture Order PlacedUmeda Office Tower Lobby

Labor by Segment

Labor against sales, by department, event, room work, fulfillment or agent.

velocity.calistoco.com/velocity/reports/event-staffing

Reports

Labor vs SalesDepartment LaborOperating DaysEvent StaffingHousekeeping LaborMaintenance LaborFulfillment LaborAgent Output
01/10/202631/10/2026By ClientExport CSV
EventPeopleLabor HoursLabor CostRevenueLabor % of RevenueRevenue per Labor Hour
Boda Hernández Peña · Casa de Campo24212RD$148,400RD$1,240,00012.0%RD$5,849
Congreso Médico del Caribe38356RD$263,400RD$2,185,00012.1%RD$6,138
Festival Gastronómico Zona Colonial31274RD$189,100RD$1,560,00012.1%RD$5,693
Lanzamiento Banco Popular16118RD$94,400RD$865,00010.9%RD$7,331
Gala Benéfica Fundación Mar Azul22186RD$139,500RD$1,120,00012.5%RD$6,022
Concierto Anfiteatro Puerto Plata45392RD$282,200RD$2,410,00011.7%RD$6,148

Figures by Permission

Costs and billing follow each person’s money settings, or read Not shared with you.

velocity.calistoco.com/velocity/reports/profitability

Reports

What the work earned and cost, and how the team’s hours were used, per currency.

ProfitabilityUtilizationCost vs OutputHire vs FreelanceBudget BurnOriginationRealizationProject MarginOverdue & At RiskUpcoming Deadlines
01/10/202631/10/2026By ClientExport CSV
NameHoursBillable HoursBilledCostProfitMargin %
Household Survey · Kisumu County184:30162:00Ksh 2,140,000Not shared with youNot shared with youNot shared with you
Mobile Money Study · Safaricom Foundation142:00136:30Ksh 1,785,000Not shared with youNot shared with youNot shared with you
Market Sizing · East Africa Breweries96:0088:00Ksh 1,120,000Not shared with youNot shared with youNot shared with you
Customer Panel · Nairobi Water71:3064:00Ksh 846,000Not shared with youNot shared with youNot shared with you
Brand Tracker · Twiga Foods58:0052:30Ksh 694,000Not shared with youNot shared with youNot shared with you
On a Phone

Run your own week from a phone, signal or not

Home on a phone is the timer in one tap, your own week and what waits on you. Time, a timer, an expense and a Daily Log entry made with no signal are held and sent once.

Home

Your timer in one tap, what needs you, and your week so far.

Velocity
Your Timer
Timer Running00:47:12Boiler room surveyStop
Needs You
Waiting on You3
Timers Left Running1
My Steps2
Your Week
Not submittedLogged 28:15 · billable 25:45

My Week on a Phone

Your week day by day, handed in with Submit Week.

My Week
09/11 to 15/11 · Not submitted
Mon 9Logo system and lockups7:30
Tue 10Signage family8:00
Wed 11Bottle label artwork7:15
Thu 12Print proofs with the printer6:30
Fri 13Directional sign drawings7:30
Total36:45
Submit Week

Without Signal

Time, a timer, an expense and a Daily Log entry made offline are held on the phone and sent once.

Velocity
Saved on this device. It is sent when you are back online.
TimeFraming · 3:30
TimerMaterial pickup · from 07:12
ExpenseLumber yard · $412.60
Daily LogRain stopped work at 11:00
This Device
Keep Velocity on this deviceVelocity is being kept on this device.

Add to Velocity

A photo, a PDF or words shared from the phone become a receipt, a project’s file or a log entry.

Add to Velocity
IMG_4182.jpgPhoto
Where does it go?
A Receipt
A File on a Project
Your Projects
Brand Refresh · Cableway
Packaging · Fynbos Gin
Other Open Projects
Wayfinding · V&A Waterfront
Annual Report · Sanlam

Buttons in the Notice

Stop Timer and Submit Week, from the notification itself.

18:04
VelocityYour timer is still runningStop it if you are done, or keep it running if you are still working.Stop Timer
VelocityHand in your weekYour hours for 02/11 to 08/11 are not handed in yet. Submit your week when it is ready.Submit Week

Widgets

Waiting for a Decision and My Hours on Windows, never a money figure.

09:12
VelocityWaiting for a Decision17Hours5Expenses4Requests2Pre-Bill3Reimbursements2Statements1ReviewOpen VelocityRefreshVelocityMy HoursNot handed in yetThis Week31:45Billable This Week27:30Today6:15Start TimerOpen VelocityRefresh
Velocity
Your Timer
Timer Running00:47:12Boiler room surveyStop
Needs You
Waiting on You3
Timers Left Running1
My Steps2
Your Week
Not submittedLogged 28:15 · billable 25:45
Pricing

No setup cost. Pay when you start using.

For work billed by the hour or delivered in phases.

Calisto Ops

Billed for each person on a project team.

€55/user/mo

Included with Calisto Ops. Invoices are posted by Ledger and shifts are planned in Workforce, each priced on its own page.

Recommended for you

Works well together.

Calisto Ledger

Calisto Ops

Double-entry books set up your way, every Calisto app’s money posted to them, invoices and who owes, supplier bills read and matched, receipts as expenses, the bank reconciled, money held for others, and the statements your accountant files from.

Learn more →
€40/user/mo
Calisto Workforce

Calisto Ops

The schedule built from what is booked and when people can work, clock-in on any phone or a shared tablet, time off and timesheets signed off once, a pay report for your payroll and payslips back, labor rules, the team and hiring from your careers page.

Learn more →
€22/user/mo
Calisto Dispatch

Calisto Ops

Requests and work orders, tasks assigned by who is free and near, templates and recurring work, the team and its contractors, routes by road, service levels and analytics, and the day worked from a phone with no signal.

Learn more →
€65/user/mo
Calisto Automations

Calisto Ops

Rules that start from your Calisto apps, a schedule or a date and act across them all, every app’s automatic messages as rules, sequences that follow up until a person acts, and every run on record.

Learn more →
€55/user/mo
Calisto Deals

Calisto Commerce

The CRM: leads routed and claimed, a pipeline on your own stages, quotes as versions and the contracts they become, people and companies, the day’s follow-ups, the handoff after the sale, commissions and the forecast.

Learn more →
€55/user/mo
Calisto Proposals

Calisto Commerce

Designed proposals priced by a quote from your catalog, sent by email, text, WhatsApp or a link, then chosen, accepted, signed and paid on one link, with follow-up, change orders and analytics.

Learn more →
€0.85per proposal
Calisto Navigator

Calisto Navigator

A portal with its own journey and messages, each client’s own records, unlimited clients signing in without passwords, and its own domain.

Learn more →
€30/portal/mo
Calisto Registry

Calisto Commerce

Your Core app shows everything your Commerce and Ops plans turn on.

Learn more →
2%of revenue

How Velocity compares

Spec Sheet

Everything included in Calisto Velocity.

Time
  • A timer started from Home in one tap or the Start Timer shortcut, and time logged after the fact in Time.
  • Time on a project’s task, on a work order, on a ticket or on no task at all, in the business the person works in.
  • Each entry billable or not, by the task’s default unless the person changes it.
  • Logged time counted one way: whole minutes, by the business’s rounding.
  • Time ▸ Entries and Time ▸ By Person, with today’s, this week’s, billable and not yet invoiced hours.
  • Required notes on an entry, when the business turns them on.
  • A Core app records time on its own work orders and jobs, and it comes back here (with Dispatch).
My Week
  • My Week: the person’s own week, clock and work time together, one block shown in Velocity, Today and Workforce.
  • A cell of the week typed straight in, and calendar events suggested as entries to accept or leave.
  • The week handed in once and signed off once on the approval engine, then locked; who may reopen it is a setting.
  • Week cadence per entry, weekly or per pay period, the week’s first day, and which hours count: the clock, the time, or both (with Workforce).
  • Timer Still Running and Week Not Submitted reminders, each an Automations rule of the team kind, on by default (with Automations).
Expenses
  • Every expense captured by the one receipt capture, the same in Ledger, Today and Velocity, and from the Vida circle (with Ledger).
  • Mileage claims by distance, in kilometers or miles, at each category’s rate in its own currency.
  • Per-diem rates, a receipt required above an amount in each currency, and categories, each a setting.
  • Expenses filed as they arrive, weekly or as a report, by the business’s submission setting.
  • Expense reports: whose, which week, where each stands and what it comes to, one total per currency.
  • Each expense reimbursed to the person, billed to a client project or kept as a cost.
  • Reimbursements as a line on Workforce’s pay report, or a payable to the person through Ledger (with Workforce and Ledger).
Requests
  • Travel requests asked before the trip, with the days away, the destination and the estimate in its own currency.
  • Travel above the business’s amount is held until a travel request is approved.
  • The trip’s expenses set against the request, and what was spent read from them.
  • A purchase asked as a draft purchase order, on the purchase order’s own approval (with Ledger).
Review
  • One review desk for every decision about work and spend, the same items as the Approvals panel in the person’s menu.
  • The person-week, expense reports, expenses as they arrive, travel requests, pre-bill write-downs and contractor statements.
  • Each decision shown with its context beside it: the week’s hours, the report’s lines, the invoice or statement it touches.
  • Approvers by person, money group or role, their order and levels, thresholds per currency, delegation, timeout and escalation.
  • Contractor statements signed off, then posted as the statement’s own payable (with Ledger).
Projects
  • Client work or internal work: internal work takes time, expenses, bills and work orders as cost and is never billed.
  • Projects as a list and by status, owner, type and client, the same workspace in every app that shows projects.
  • A project opened by hand, from a contract, a Talent tour, a won deal, a request won through World, Local or Calisto Agency, or for a record (with Deals and Talent).
  • A project for a record: a development’s build, a location’s fit-out, an event’s production; the record lists its projects.
  • Status planned, in progress, on hold, completed or cancelled, and closed, which takes no new time, costs or invoices until reopened.
  • The project page: Overview, Timeline, Milestones, Tasks, Key Dates and Conditions, Parties, Documents, Updates, Change Orders, Budget, Time and Costs, Billing, Site Controls and Details, each shown when it holds something.
  • The same project page in Ledger, Trades, Legal, Talent, Creators, Listings, Events and Stays, in each app’s words.
  • Projects inside projects: a building with a project per unit, a season with each wedding, each with its own client and schedule.
  • Margin and Margin % against the project’s price, and Profit on what was invoiced, in the project’s own currency; unknown when an hour has no pay rate.
  • A project’s files from Depot on its card (with Depot).
Schedule and Milestones
  • Timeline: the Gantt of the project’s tasks and milestones, with links, a today line and Day, Week or Month.
  • A bar dragged, resized or moved by arrow keys; a move with dependents lists each one’s old and new date for Move All or Just This One.
  • On a phone, the Timeline is a list by date, grouped by week.
  • Milestones with a target day, the day reached, progress, a status, who is responsible and the milestone each waits on.
  • Mark Complete: the payments waiting on a milestone fall due with it.
  • A milestone the client approves waits on them; sent back, it is open work again with their reason.
  • What If It Slips: the milestones and payments a delay would move, across projects, moving nothing.
  • The payment schedule of a contract’s project: a payment tied to a day or a milestone, Split the Balance and Apply a Milestone Plan.
Clients
  • Updates for the client: posted with the milestone reached and progress photos, shared or kept back (with Navigator).
  • Draft With Calisto writes an update from what the project recorded since the last one, never a price or a name, and saves nothing.
  • Tasks shared with the client, on their portal’s board by status and the project calendar (with Navigator).
  • Required documents asked of a party, sent, accepted or sent back with a reason, every step dated.
  • The client’s approvals and sendings-back emailed by Automations rules (with Automations).
Contracts
  • A contract’s steps, conditions, documents, signatures and money lines worked on its project.
  • My Steps, Deadlines, At Risk, Documents In, Third-Party Coordinators and Deposits, across every contract, each row opening its project.
  • One party list per project: organization, in-house person and whom each represents.
  • Deposits held by a party of the project, with their guarantee or insurance, cover and expiry; At Risk flags a deposit past its cover.
  • Contract steps added from the account’s steps for a kind of contract.
  • Change orders: approve, reject with a reason, send for signature and execute; executing moves the contract’s value, the payment schedule, the cost line and the milestones it names (with Sign).
Site and Subcontractors
  • Requests for Information, numbered per project, with an owner, a deadline and the work each blocks.
  • The Daily Log: the day’s diary, and an order book of orders and site visits signed by their issuer and counter-signed, on where the country keeps one.
  • Sign-offs of a scope of work, passed or failed through the Approvals panel.
  • Handover of the finished work, its keys and documents.
  • Subcontracts as pay agreements: a fixed fee, a cost line, a work scope, the documents required before going on site and its signature.
  • Variations decided in Approvals and owed on the payee’s statement; retentions held and released on the statements, never past their cap.
  • Delivery: every project’s RFIs, Daily Log, Subcontracts, Retentions, Sign-Offs and Handover on one board each.
  • One budget: hours or money for the project, a task or a person, or cost lines with planned, committed, spent and the cost to complete.
Billing
  • To Invoice: every item of work not yet invoiced, with its decision on its row.
  • Pre-bill review: written up or down, or deferred, the original kept; a write-down above the business’s share waits in Review.
  • Invoices grouped by project, with the time report attached, several projects on one invoice when they share a currency (with Ledger).
  • Rates: the price engine’s adjustments by person, project or task, and Service Prices, the services an hour is sold as.
  • Fee terms: a success fee on the deal’s value, a capped fee and split billing between payers.
  • Retainers: an allowance of hours or of an amount per week or month, for a client, a project or a maintenance contract, with a warning share, rollover and cap, warn or bill.
  • Packages: inclusions the client bought, drawn down by the tasks that deliver them or by Record Use, each use dated (with Registry).
  • Deposits and the payment schedule’s instalments on a contract’s project.
  • Research, from the project: a legal research service opened with the client-matter number, and its cost-recovery file imported as disbursements.
  • Export files in Xero’s and QuickBooks’ import formats for books kept elsewhere; no sync.
Capacity and Reports
  • Capacity: people across projects and weeks, planned against what each can work from their shifts or pattern, and anyone planned past their hours.
  • Profitability, Utilization, Cost Against Output, Hire Against Freelance and Budget Burn, every cost by the one labor-cost rule Workforce’s pay report uses.
  • Origination and Realization, per currency, with ethical walls applied.
  • Project Margin, Overdue and At Risk, Upcoming Deadlines, Yield by Type and Change-Order Value.
  • Each segment’s labor report: labor against sales, department labor, operating days, event staffing, housekeeping, maintenance, fulfillment and agent output.
  • Trades’ work reports by crew, service and location, and Events’ Shows against their budgets (with Trades and Events).
  • Every report per currency, totals never converted.
Home and Phone
  • Home: what waits on you, hours this week and billable, open projects, projects to invoice, budgets at an alert, people planned past their hours and timers left running.
  • Tabs: Home, My Week, Review and Projects; Contracts, Delivery and the rest under More.
  • Shortcuts: Start Timer, Log Time, New Expense, My Week, Review and New Project.
  • Home, My Week, Time, Expenses and the Daily Log open with no signal; time, a timer, an expense and a Daily Log entry made offline are sent once.
  • Add to Velocity: a photo, a PDF or words shared from the phone become a receipt, a project’s file or a Daily Log entry.
  • Timer Still Running carries Stop Timer and Week Not Submitted carries Submit Week.
  • Waiting for a Decision and My Hours widgets on Windows, counts and hours only.
Settings and Access
  • One settings page: Approvals, the week, expenses, billing, budgets and capacity, projects, contractor statements, contract steps, delivery and research.
  • Every figure follows the reader’s money settings: billing under Look up payments, costs, margin and profit under See costs; a withheld figure reads Not shared with you.
  • Other people’s timers listed only to someone the owner lets see colleagues.
  • A freelancer works in their own account, on their own project, and invoices the client; nothing is written into the client’s account.
  • A one-time import of clients, projects, rates, time, expenses and invoices at pro.calistoco.com/switch.
Honest answers

Questions about Calisto Velocity

No. Time is recorded where the work happens: on a work order in Dispatch or a Core app, on the clock in Workforce, or with the timer on Velocity’s phone Home. A receipt is captured from Ledger, Today or the Vida circle on every page. All of it comes back to Velocity to be reviewed.

It is locked, and its billable hours wait in To Invoice. Write them up or down or defer them, with the original kept beside the change, then invoice them grouped by project with the time report attached. The invoice is Ledger’s.

As your business sets it: a line on Workforce’s pay report, which your payroll provider takes, or a payable to the person through Ledger. An expense can instead be billed to a client project or kept as a cost.

The project’s own. Several projects go on one invoice only when they share a currency, every report gives one total per currency, and nothing is converted.

No. A project is client work or internal work. Internal work takes time, expenses and bills as cost and reads its budget the same way, and every billing step refuses it.

No. Ledger posts what Velocity decides, and Workforce gathers the hours for your payroll. If your books are kept elsewhere, export the files your accounting software imports.

Velocity is included with Calisto Ops, or billed for each person on a project team. Both are in the pricing section on this page, read from the live catalog.